您现在的位置:建筑结构>> 期 刊>> 2007年>> 第09期>>正文内容
新型钢管混凝土不穿心节点静载试验研究
梁志红1,胡狄2,陈星1,李宁1,张杰1,翁泽松1
摘 要

(1 广东省建筑设计研究院,广州510010; 2 中南大学土木建筑学院,长沙410075)
[提要]基于钢管混凝土柱与钢筋混凝土密肋扁梁连接的新型不穿心节点型式,进行了典型节点的静载试验。介绍了试验方案、试件制作、加荷方式、试件的裂缝发展情况及破坏形态等。试验结果表明,新型节点整体上设计合理,传力明确,易于施工;在高层建筑中新型节点可极大降低节点区空间,具有良好的安全和经济性。
[关键词]高层建筑;钢管混凝土柱;不穿心节点;静载试验
Static Experimental Study on New Type Non-through-core Concrete-filled Steel Tube Connection/Liang Zhihong1, Hu Di2, Chen Xing1, Li Ning1, Zhang Jie1, Weng Zesong1 (1 The Architectural Design and Research Institute of Guangdong Province, Guangzhou 510010,China; 2 College of Architecture of Central South University, Changsha 410075,China)
Abstract: Based on presented novel no-through-core concrete-filled steel tubular connection with flat beams with dense ribs, static experiments on typical connections have been fulfilled. The experimental scheme, fabrication of specimens, loading system, development of cracks and failure models are described. Experimental results show that the design of the novel connection is reasonable, force transmission is clear and it is easy to be constructed. The usage of the novel connection will reduce the space around connection, thus its economical for the highrise building to adopt the novel connection.
Keywords: high-rise building; concrete filled tubular column; non-through-core connection; static experiment

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!