您现在的位置:建筑结构>> 期 刊>> 2013年>> 第11期>>正文内容
天津富润中心超高层结构设计
吴昭华1,孙芬2,邹安宇3,严开涛1,万怡秀1,陈燕1,张莉华1,吴连杰1,喻员林1
摘 要

 

吴昭华1,孙芬2,邹安宇3,严开涛1,万怡秀1陈燕1,张莉华1,吴连杰1,喻员林1
1 北京富力城房地产开发有限公司, 北京 100022 2 北京天鸿圆方建筑设计有限责任公司,
北京 100062 3 廊坊澳美基业房地产开发有限公司, 廊坊 065001
[摘要]天津富润中心采用钢管混凝土叠合柱和钢筋混凝土核心筒作为结构受力体系,并利用避难层设置伸臂桁架加强其侧向刚度。提出了合理的抗震性能目标,并进行了小震弹性和大震弹塑性分析,将概念设计和计算充分结合,确保了结构方案的安全合理。在基础设计中选择了合理的静载试验方案,并采用变刚度调平来减小内筒和外框之间的沉降差。对一次性加载、正常施工模拟加载、考虑逆作的施工模拟加载三种施工顺序进行了模拟加载分析。针对钢管叠合柱与混凝土梁连接节点,提出了在钢管壁开方洞补强的方案,进行了节点补强有限元分析和节点试验。对两栋塔楼之间的裙房梁板进行了专项有限元分析,按中震不屈服配筋,并进行了大震不坍塌验算。通过将加强层核心筒角部内置圆钢管改为方钢管端柱,优化了此位置连接节点。
[关键词]天津富润中心; 钢管混凝土叠合柱; 开方洞补强
中图分类号:TU9733文献标识码:A文章编号:1002848X(2013)11004208
Structural design on super tall buildings of Tianjin R&F Center
Wu Zhaohua1, Sun Fen2, Zou Anyu3, Yan Kaitao1, Wan Yixiu1, Chen Yan1, Zhang Lihua1, Wu Lianjie1, Yu Yuanlin1 (1 Beijing R&F Properties Development Co., Ltd., Beijing 100022, China 2 Beijing Tianhong Yuanfang Architectural Design Co., Ltd., Beijing 100062, China 3 Langfang Aumay Real Estate Development Co., Ltd., Langfang 065001, China)
Abstract:Concrete filled steel tube composite columns and framecore wall system form the structural system of Tianjin R&F Center, in which outriggers are used to strengthen lateral stiffness. Combined with conceptual design and structural calculations, proper seismic performance objectives were proposed, while elastic analysis under frequent earthquakes and elasticplastic analysis under severe earthquakes were carried out to ensure the safety. In foundation design, proper static load test was selected and balance design method for variablerigidity was used to reduce the settlement difference between core wall and frame. Three kinds of construction simulation analysis method were carried out, including oneoff loading, construction simulation loading and construction simulation with consideration of inverse construction. For connecting concrete filled steel tube composite columns and RC beams, the method of opening square hole on steel tube wall to reinforce relevant areas was proposed, while corresponding finite element analysis and test were applied. For the podium between the two towers, nonyielding reinforcement under moderate earthquakes and noncollapse assessment calculations under severe earthquakes were performed based on special finite element analysis. Circular steel tubes in the corners of core wall in the reinforced layer were changed to concrete filled steel tube rectangular columns to optimize the joints.
Keywords:Tianjin R&F Center; concrete filled steel tube composite column; opening square to reinforce
作者简介:
吴昭华,一级注册结构工程师,设计研发中心结构室主任,Email:283006664@qq.com
参考文献
1]谢状宁,倪振华.富力天津小白楼项目风洞试验和风振分析报告[R.广州:汕头大学,2008.
2]严开涛,万怡秀,吴昭华,等.软土地区超高层全逆作法工程实践[J.建筑结构,201343(11)50\|54,79.
3JGJ 32010 高层建筑混凝土结构技术规程[S.北京:中国建筑工业出版社,2011.
4]陈聚忠,杨国华.天津市富力中心项目工程场地地震安全性评价报告[R.天津:中国地震局第一监测中心,2008.
5GB 500112001 建筑抗震设计规范[S.2008年版.北京:中国建筑工业出版社,2008.
6]杨洪斌,张景恒.天津地区建筑物的沉降分析[J.岩土工程学报,199416(5)6571.
7BS 81101: 1997 Structural use of concrete: Part 1: Code of practice for design and constructionS.
8]胡庆昌.建筑结构抗震减震与连续倒塌控制[M.北京:中国建筑工业出版社,2007.
9]蔡绍怀.现代钢管混凝土结构(修订版)[M.北京:人民交通出版社,2007.
10]钱稼茹,李宁波.天津富润中心钢管壁开洞组合柱试验报告[R.北京:清华大学,2011.
11]曹万林,王敏,王绍合,等.矩形钢管混凝土边框组合剪力墙及筒体结构抗震研究[J.工程力学,200825S1):5870.
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!