您现在的位置:建筑结构>> 期 刊>> 2007年>> 第09期>>正文内容
地下室逆作法集成技术的设计及应用
罗赤宇,陈星
摘 要

 (广东省建筑设计研究院,广州510010)
[提要]针对地下室逆作法技术应用中存在的技术集成复杂、施工难度大等问题,提出了地下室逆作法集成技术的概念,并给出了逆作法设计中关键环节的技术集成思路、原则及相应的设计方法。结合多个实际工程中逆作法的应用情况,对设计和施工中集成的新技术、新工艺的特点以及效益进行了分析,为逆作法技术在今后的应用提供借鉴和参考。
[关键词]地下室逆作法;集成技术;柱支式地下连续墙;约束拉杆;异形钢管混凝土柱
Design and Application of Integral Technique for Basement"s Top-down Construction/Luo Chiyu, Chen Xing (The Architectural Design and Research Institute of Guangdong Province, Guangzhou 510010, China)Abstract:To solve the critical problems of complicacy in technique and difficulty in application during the practice of the basements topdown construction, the conception of the integral technique for basement"s top-down construction is put forward. The path, principle and design method of sticking points in the integral technique are also presented. Based on the experience of the application of top-down method in some projects, the character of new techniques integrated in design and construction as well as economic benefit is analyzed, which can be referred for future top-down construction.
Keywords: top-down construction;basement;integral technique;column-supported diaphragm wall; concrete filled special-shaped column; restrained tensile bar

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!