天津大剧院吊挂结构抗连续倒塌分析*
丁阳1,2,孙健1
摘 要
丁阳1,2,孙健1
(1 天津大学建筑工程学院,天津 300072;  2 天津大学滨海土木工程结构与安全教育部重点实验室,天津 300072)
 
[摘要]天津大剧院采用了国内外应用不多的吊挂结构体系。以天津大剧院的吊挂结构为工程背景,对其进行抗连续倒塌性能分析。根据吊杆负荷面积,采用基于能量的方法,计算吊杆的重要性系数,确定关键吊杆。对单根关键吊杆失效和两根关键吊杆同时失效的情况,采用静力非线性方法对剩余结构进行响应分析。结果表明,单根吊杆失效时,吊挂结构不会发生坍塌;标高+20.9m吊挂层转角区域两根吊杆同时失效时,吊挂结构发生局部坍塌,使用过程中应注意该区域吊杆的监测。
[关键词]天津大剧院;吊挂结构;吊杆;移除构件法;连续倒塌
中图分类号:TU323      文献标识码:A      文章编号:1002-848X(2013)10-0016-05
 
Progressive collapse analysis on the suspension structure of Tianjin Grand Theatre
Ding Yang1,2, Sun Jian1
(1 School of Civil Engineering, Tianjin University, Tianjin 300072, China;  2 Key Laboratory of Coast Civil Structure Safety China Ministry of Education, Tianjin University, Tianjin 300072, China)
 
Abstract: Tianjin Grand Theatre adopts a structural system of suspension. This system has few applications in the world. The resistance behavior of the system to progressive collapse was analyzed. In terms of the bearing area of suspenders, importance coefficients were evaluated and critical suspenders were determined using an energy method. Using a static nonlinear approach, the response of the residual structure was analyzed under the cases of either the failure of single suspender or the simultaneous failure of double suspenders. Results show that the Tianjin Grand Theatre would not collapse if only one suspender fails. However, when two suspenders simultaneously fail at some locations, local collapse will occur. Suspension structure partially collapses when two suspenders in the corner area of 20.9 high suspended layers fail at the same time. Therefore, it is suggested that the monitoring of these critical suspenders be needed when the suspension structure is in use.
Keywords: Tianjin Grand Theatre; suspension structure; suspenders; method of removing critical members; progressive collapse
*天津市科技支撑计划重大项目(11ZCZDSF04800)。
作者简介:丁阳,博士,教授,Email:dingyang@tju.edu.cn。
 
参考文献
[1]GSA 2003 Progressive collapse analysis and design guidelines for new federal office buildings and major modernization projects [S].USA: General Services Administration, 2003.
[2]UFC 4-023-03 Design of buildings to resist collapse [S]. USA: Department of Defense, 2005.
[3]Structural use of concrete: Part 1: Code of practice for design and construction[S]. England: British Standard Institute, 1997.
[4]蔡建国,王蜂岚,冯健,等.连续倒塌分析中结构重要构件的研究现状[J].工业建筑,2011,41(10):85-89.
[5]叶列平,林旭川,曲哲,等.基于广义结构刚度的构件重要性评价方法[J].建筑科学与工程学报,2010,27(1):1-6.
[6]赵广坡,肖克艰,冯远.成都双流国际机场T2航站楼大厅陆侧大跨钢结构抗连续倒塌分析[J].建筑结构,2010,40(9):27-30.
[7]周健,陈素文,苏骏,等.虹桥综合交通枢纽结构连续倒塌分析研究[J].建筑结构学报,2010,31(5):174-180.
[8]张坚,路岗,虞炜,等.吊楼结构抗连续倒塌设计[J].建筑结构,2010,40(5):365-368.
[9]蔡建国,王蜂岚,冯健,等.新广州站索拱结构屋盖体系连续倒塌分析[J].建筑结构学报,2010,31(7):103-109.