预制装配整体式混凝土框架-剪力墙结构设计*
- 摘 要
-
郑振鹏,郑仁光,李峰(上海市城市建设设计研究总院,上海 200125)[摘要]以一栋框架-剪力墙结构住宅为工程背景,对预制装配整体式框架-剪力墙结构的设计方法进行了详细论述。由于国内尚没有相同结构形式工程的设计经验,如何保证该结构达到等同现浇结构的性能是设计关键,从结构整体计算、关键构件与节点的设计等几个方面进行了深入探索和研究,相关方法与思路可为类似的结构设计提供参考。[关键词]预制结构;框架-剪力墙结构;等同现浇结构;整浇式节点;关键构件中图分类号:TU375 文献标识码:A 文章编号:1002-848X(2013)02-0028-05Design on precast assembled monolithic reinforced concrete frame-shear wall structureZheng Zhenpeng, Zheng Renguang, Li Feng(Shanghai Urban Construction Design & Research Institute, Shanghai 200125, China)Abstract: Based on a frame-shear wall building, design of the precast assembled monolithic reinforced concrete frame-shear wall structure was discussed in detail. Due to the lack of the design experience of the structure, it is the key issue to ensure the structure to reach the performance of cast in-place equal structure. Several aspects were explored and researched further, such as calculation of the whole structure, design of key members and joints, and so on. The results could provide reference for similar structures.Keywords: precast structure; frame-shear wall structure; cast-in-place equal structure; cast-in-place joint; key member*上海市科学技术委员会科研计划项目(10dz0583700)参考文献[1] JGJ 3—2010 高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.[2] 大型居住社区浦江镇基地四期A块、五期经济适用房项目0502地块超限高层建筑工程抗震设防专项审查报告[R].上海:上海市城市建设设计研究总院,2011.[3] 预制混凝土结构梁柱节点抗震性能实验研究报告[R].上海:同济大学土木工程防灾国家重点实验室,2008.[4] DBJ/CT 082—2010 润泰预制装配整体式混凝土房屋结构体系技术规程[S].上海:上海市建筑建材业市场管理总站,2010.[5] DG/TJ 082071—2010 装配整体式混凝土住宅体系设计规程[S].上海:上海市建筑建材业市场管理总站,2010.[6] CECS 43:92钢筋混凝土装配整体式框架节点与连接设计规程[S].北京:中国建筑工业出版社,1994.[7] SJG 18—2009预制装配整体式钢筋混凝土结构技术规范[S].深圳:深圳市住房和建设局,2009.