您现在的位置:建筑结构>> 期 刊>> 2009年>> 增刊02期>>正文内容
锦城艺术宫改扩建工程结构方案可行性研究
高晓莉,邓开国,何鹏辉
摘 要

高晓莉,邓开国,何鹏辉
(中国建筑西南建筑设计研究院有限公司,成都610081)

[摘要] 锦城艺术宫改扩建工程写字楼由于功能需要在局部楼层形成无柱大空间,使结构面临二次高位转换的难题。对应不同建筑方案分别提出了钢结构巨型框架体系和钢结构框架-支撑体系结合转换桁架两种结构方案,并通过初步计算对两种方案的可行性进行了研究。
[关键词] 巨型框架;框架-支撑体系;转换桁架;大空间;二次高位转换;可行性

The program feasibility research of reconstruction and  extension  project of Jincheng Arts Palace
Gao Xiaoli,  Deng Kaiguo,  He Penghui
(China Southwest Architecture Design and Research Institute Co., Ltd., Chengdu 610081, China)

Abstract: Because of function necessary to form large column-free space at the local floor, The project of reconstruction and extension of Jincheng Arts Palace face to the second-high-conversion problem. Mega-frame steel structure and steel braced-frame structure combined with transfer truss are mentioned separately according to different building programs, and through a preliminary calculation, the feasibility of the two types of programs are researched.
Keywords: mega-frame; braced-frame structure; large space; second-lugh-conversion; transfer-truss; feasibility

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!