- 摘 要
-
刘晓华, 贺虎成, 李志强, 刘 丹
(总装备部工程设计研究总院,北京100028)[摘要] 为了实时监测北京奥运会、残奥会开闭幕式大跨度威亚主钢索的安全可靠性,建立了大兴训练场、国家体育场大跨度威亚主钢索安全健康监测系统。通过威亚主钢索实时监测数据与仿真计算值的对比分析,验证了理论计算模型。结果表明,大跨度威亚主钢索设计合理、工作状态与设计状态一致,上空大跨度威亚主钢索系统安全、可靠。为奥运会、残奥会开闭幕式上空演员和道具的安全、精彩演出决策提供了科学依据。
[关键词] 大跨度索网结构;内力监测;变形监测;试验;计算分析Health and Safety Monitoring Research and Analysis on Large-spans Crossed Main Steel Cable for Wire at Beijing Olympic Games Opening and Closing Ceremonies
Liu Xiaohua, He Hucheng, Li Zhiqiang, Liu Dan
( Center for Eng. Design and Research under the General Equipment Department, Beijing 100028, China)Abstract: The health and safety monitoring systems for large-span main carrying ropes used for wire in the National Stadium and the Daxing practice stadium were set up to Real-time Monitor the security and reliability of the large-span steel cables at Beijing Olympic Games and Paralympic Games opening and closing ceremonies. Through the comparative analysis of the real-time monitoring data and simulation value, the theoretical calculation model was verified. The result has indicated that the design of the main large-span steel cable is reasonable, its working condition and designed state is consistent, and the system is safe and reliable. It has provided a scientific decision basis for playors and props in aerial safe and wonderful performance at the Beijing Olympic games and Paralympic Games opening and closing ceremonies
Key words: large-span cable net structure; internal force monitoring; deformation monitoring; test; calculation analysis