您现在的位置:建筑结构>> 期 刊>> 2009年>> 增刊01期>>正文内容
深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作施工方法与结构整体有限元分析
刘 畅, 张 剑, 檀传江, 李博雅
摘 要

刘  畅,  张  剑,  檀传江,  李博雅
(深圳大学建筑设计研究院,深圳518060)

[摘要] 简要介绍深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作法施工方法与结构整体的有限元分析。考虑了土体参数对结构受力及变形的影响,利用弹簧单元模拟土对结构的作用,采用有限元程序分施工阶段和使用阶段对整个结构进行计算分析,较真实反映了结构构件的受力及变形,为类似工程提供了一定的经验参考。
[关键词] 地下工程;盖挖逆作施工方法;有限元分析

Cover and Cut Method and Finite Element Analysis of Comprehensive Transportation in Futian Subway Station
Liu Chang, Zhang Jian, Tan Chuanjiang, Li Boya

Abstract: It is brieftly introduced that the cover and cut method is chosen for the comprehensive transportation hub project facilities in Shenzhen Futian subway station and this structure is simulated with finite element analysis. Taking the impact of stress and deformation of structure from the soil around the construction into account, the spring element is used to simulate the action between the soil and structure in finite element analysis of construction and operation stage, which can get more accurate results and provide a reference for similar projects.
Keywords: underground project; cover and cut method; finite element analysis

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!