- 摘 要
-
(中国建筑科学研究院建筑结构研究所 北京 100013)
【提要】 对横穿混凝土后浇带钢筋对后浇带效能的不利影响进行了详细分析,给出了导致后浇带失效的横穿钢筋最大配筋率ρs,max及应用实例,提出了相应的实用设计建议。如建议近似在0~0.5ρs,max范围内控制横穿后浇带的设计配筋;对横穿后浇带
的钢筋尽可能采用搭接连接方式等。
【关键词】 混凝土收缩 混凝土后浇带 横穿后浇带钢筋 后浇带效能
Calculation Analysis for Bad Effect on Efficiency of Postcasting Band in Concrete Structures by Crossed Reinforcing Steel Bars/Pan Li(Institute of Building Structures,China Academy of Building Research,Beijing 100013,China)
Abstract:Based on the calculation analysis about the bad effect on efficiency of postcasting bands in concrete structures by the crossed reinforcing steel bars,the formula of the maximum ratio ρs,maxof crossed steel bars is deduced. Samples of ρs,maxand the useful design proposals are given for the practical need of superlong and continue concrete structures.
Keywords:concrete shrink;postcasting band;steel bars across postcasting concrete band;efficiency of postcasting concrete band