您现在的位置:建筑结构>> 期 刊>> 2010年>> 增刊02期>>正文内容
高真空击密法加固吹填土地基试验研究
颜庆智1,崔 亮1,江立群2
摘 要

颜庆智1,崔  亮1,江立群2
(1 中国石油大学土木工程系,青岛266555; 2中煤国际工程集团重庆设计研究院,重庆400010)

[摘要] 结合传统的软土地基处理方法,提出利用高真空排水和击密施工交替进行的高真空击密法加速夯后超静孔压消散和软土固结,并结合黄河三角洲地区某吹填土地基进行了现场试验研究,对高真空击密法的工艺流程、试验参数、加固后的土体变形、超静孔压变化以及加固效果进行了分析。研究表明高真空击密法是一种工期短、效果佳、成本低的软土加吲工艺,适合于黄河三角洲地区新近沉积的吹填土。
[关键词] 高真空击密法;吹填土;加固;现场试验

In-situ test study on hydraulic fills ground reinforcement by lugh vacuum compaction method
Yan Qingzhi1, Cui Liang1, Jiang Liqun2
(1 College of Civil Engineering, China University of Petroleum, Qingda0 266555, China; 2 Chongqing Research & Design Institute of Sino-coal International Engineering Group, Chongqing 400010, China)

Abstract: Combining with traditional soft ground reinforcement methods, high vacuum compaction method of using high vacuum drainage and dynamic consolidation alternately to accelerate the dissipation of excess pore water pressure and the consolidation of soft soil was proposed. The in-situ test was studied for hydraulic filled ground reinforcement in Yellow River Delta region, and construction process, test parameters, soil deformation, excess pore water pressure and reinforcement effect were also analyzed. It is proved that high vacuum compact method is a time-saving, effective and low-cost soft soil reinforcement method, which can be suitable for hydraulic fills ground reinforcement in Yellow River Delta region.
Keywords: high vacuum compact method; hydraulic fills; reinforcement; in-situ test