您现在的位置:建筑结构>> 期 刊>> 2010年>> 增刊02期>>正文内容
某厂房腐蚀后的结构加固决策及加固方案
程 鹏,张 辉,李海山
摘 要

程  鹏,张  辉,李海山
(云南省建筑工程设计院,昆明650041)

[摘要] 混凝土结构被氯离子严重侵蚀后,鉴定分析其承载力,针对不同的使用要求及不同腐蚀情况如何进行加固决策,来满足结构改造加固的基本功能目标。通过对云南盐矿一混凝土厂房的工程实例分析,介绍了针对氯离子腐蚀进行的相应加固措施。现该厂房加固后已使用3年,达到预期目标。
[关键词] 混凝土结构;钢筋锈蚀;加崮决策;加固方案

Structure's strengthening decision and measures to a reinforced bar rust RC frame in a salt making factory
Cheng Peng,  Zhang Hui,  LiHaishan
( Yunnan Architecture Design Institute, Kunming 650041, China)

Abstract: When the bar in RC frame rusted by the chloride ion, how to analysis the capacity of structure. According to different needs and different rusting performance, we can make the strategy and get the goal of structure strengthening. With a model in a salt factory, introduce the strengthening measures of rusted structure by the chloride ion. Now, this RC frame has been used 3 years after strengthening,it,s a successful case.
Keywords: RC frame;bar rust;strengthening decision;strengthening measures

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!