您现在的位置:建筑结构>> 期 刊>> 2010年>> 增刊02期>>正文内容
吊楼结构抗连续倒塌设计
张 坚1,路 岗1,虞 炜1,林 峰2,赵新源2
摘 要

张  坚1,路  岗1,虞  炜1,林  峰2,赵新源2
(1 上海建筑设计研究院有限公司,上海200041; 2 同济大学建筑工程系,上海200092)

[摘要] 采用替代路径法对华为上海基地多层吊楼结构进行抗连续倒塌设计。根据结构受力特点,确定了计算模型及去除的关键构件位置。材料强度设计值、荷载组合以及构件失效准则参考美国和我国相关规范中的要求。吊楼整体或大部坠落则认为结构破坏。计算表明,由于常规设计时吊楼具有合适的冗余度和较高的安全储备,吊楼通过了抗连续倒塌验算。
[关键词] 吊楼结构;抗连续倒塌;替代路径法

    Design oflocal suspension structure to resist progressive collapse
   
Zhang Jian1, Lu Gang1, Yu We1, Lin Feng2, Zhao Xinyuan2
    (1 Shanghai Institute ofArchitectural Design&Research, Shanghai 200041, China; 2 Department of Building Engineering, Tongji University, Shanghai 200092, China)

Abstract: A local suspension structure was designed to resist progressive collapse by means of alternate path method. The structural model and the removal locations of the key elements were determined according to the conceptual analysis. The design strength ofthe materials, loads combination and failure criteria for structural elements followed the provisions addressed in American and Chinese design codes respectively. The results show that, the structure meet the design requirements of resisting progressive collapse due to the appropriate redundancy degree and relative high reliability of the structure in original design.
Keywords: local suspension structure; progressive collapse; alternate path method

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!