某框架楼托梁拔柱改造设计与施工
王洪波,王宏林
摘 要

王洪波,王宏林
(北京正邦兴业建筑技术开发有限公司,北京100083)

[摘要] 该工程新的使用功能需将原结构居中的1根框架柱拔掉。设计中采用混凝土框架梁、柱增大截面法,同时框架梁双向跨度变大且形成十字梁。施工中遵循“先加固、后拔柱”的原则,首先对基础注浆加固,对梁、柱分别采用水泥基灌浆料、混凝土增大截面,再行拔柱。
[关键词] 托梁拔柱;加固

Supporting beam and removing column reform design and construction of a frame structure building
Wang Hongbo,  Wang Honglin
(Beijing Champion Construction Co.,Ltd., Beijing 100083,  China)

Abstract: The construction of new features needs to remove one frame column. The consolidation beam and column design is given by using cross-section increment in the engineer, and extends for the frame beam of the original structure to form cross-beam. Abide by first strengthening then removing the concrete column in construction, first the foundation is reinforced by pressure grouting technology, beams and columns were used cement-based grouting material and concrete to increase cross-section, then remove the frame column.
Keywords: supporting beam;   removing column;  strengthening