您现在的位置:建筑结构>> 期 刊>> 2010年>> 增刊01期>>正文内容
高烈度区隧道洞口段地震作用下动力分析*
孙建春,张照华,高 波
摘 要

    孙建春,张照华,高  波
    (西南交通大学土木工程学院,成都 610031)

[摘要] 在高烈度地震带,地下工程洞口段有可能遭受严重震害,采用FLAC3D和ANSYS软件,结合西部抗震项目,从土-结构相互作用模型出发,运用数值分析方法对隧道洞口段进行三维模拟,并对模拟结果进行分析总结,提出隧道抗震设计中应注意的几个事项及建议。
[关键词] 隧道;洞口;抗震;FLAC3D

    Study for seismic responses of underground structure entrance under earthquake
   
Sun Jianchun, Zhang Zhaohua, Gao Bo
    ( School of Civil Engineering, Southwest Jiaotong University, Chengdu 61003 1, China)

Abstract: In high earthquake intensity area, the entrance of tunnel may be fall into nun for the seismic motion. Based on soil-structure interaction model and the west project of shock absorption, the FLAC3D and ANSYS softwares and numerical analysis method were adopted to compute the tunnel entrance. The results obtained were discussed and some measures and advises for design were presented.
Keywords: tunnel; the entrance of tunnel; shock absorption; FLAC3D

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!