您现在的位置:建筑结构>> 期 刊>> 2011年>> 增刊02期>>正文内容
桩基础承载力严重不足的常见原因分析
许仲群
摘 要

    许仲群
    (汕头市澄海区建筑设计院,汕头515800)

[摘要] 分析了施工图审查中发现的造成桩基础承载力严重不足的几种常见原因,如不加以改正,则在地震或台风到来时,所设计结构将会像上海莲花河畔景苑倒楼一样破坏。其中主要原因是没有对计算机计算结果进行分析,判断结果是否符合力学原理,结构概念不清晰造成的;另外,《建筑抗震设计规范》第4. 4.1条规定的可不进行桩基抗震承载力验算的范围太广。
[关键词] 桩基础;倒楼;计算结果分析判断;结构概念
中图分类号:TU311.3    文献标识码:A  文章编号:1002-848X(2011) S2-0422-04

    Analysis on the reasons of piles' capacity shortage
   
Xu Zhongqun
    ( Shantou Chenghai Architectural Design Institute,  Shantou 515800,  China)

Abstract: The essay analyzes several common nustakes in pile foundation design, which would made the building devastated disastrously similar to the fallen building in Shanghai when earthquake or typhoon happens. The main causes are follows: there is no analysis or judgement on whether the computing results in accord with principles of dynamics, the structural concept is unclear, and the code is too tolerant in stipulating the range without checking the pile's seismic work.
Keywords: pile foundation; fallen building; analysis on the computing results; structural concept

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!