- 摘 要
-
方志伟1, 纪 明2
(1 天津送变电工程公司,天津300161;2 天津市电力公司,天津300010)[摘要] 结合金角西220kV变电站地质情况,对几种常用的地基处理方法从技术角度进行分析对比,结合经济分析,选择出相对优化的地基基础技术方案。
[关键词] 变电站;水泥混凝土;抗渗防腐;技术措施
中图分类号:TU473 文献标识码:A 文章编号:1002-848X(2011) S2-0416-03Engineering foundation treatment measure selection of west golden corner substation
Fang Zhiwei1, Ji Ming2
(1 Tianjin Electric Transrmssion and Transformation Engineering Corporation, Tianjin 300161, China; 2 Tianjin Electric Power Corporation, Tianjin 300010, China)Abstract: Combined with the geological condition of west golden comer substation, several commonly used foundation treatment measures were analyzed and compared from the tecluucal angle, the relatively optimal foundation tecluucal scheme was selected with economic analysis.
Keywords: substation; cement concrete; impermeability corrosion prevention; tecluucal measure