您现在的位置:建筑结构>> 期 刊>> 2011年>> 增刊02期>>正文内容
某钢厂中厚板卷工程卷取机深基坑支护
金淑鑫, 罗福盛
摘 要

    金淑鑫,  罗福盛
    (中冶赛迪工程技术股份有限公司,重庆400013)

[摘要] 在老厂改扩建工程中,经常遇到新建设备基础基坑需在不停产状态下开挖,基坑开挖深度超过相邻既有基础的情况,因此,基坑支护的安全性、合理性就成为工程能否顺利实施的关键问题。介绍了某钢厂卷取机设备基础深基坑支护方案的要点和设计原则,可供同类设备基础基坑支护设计、施工参考。
[关键词] 卷取机基础;深基坑;支护
中图分类号:TU473    文献标识码:A  文章编号:1002-848X(2011) S2-0402-04

Deep excavation supporting for coiling machine of the heavy and medium plate mill for the steelwork
Jin Shuxin, Luo Fusheng
( CISDI Engineering Co., Ltd., Chongqing 400013, China)

Abstract: In the process of reconstruction or expansion of the old plant, it is often encountered that excavation for the new equipment foundation is carried out without stopping the production or that the depth of the excavation is deeper than the adjacent existing foundation. Therefore, the safety and rationality of the excavation supporting become a key point for the smooth implementation of the project. The key points and design principles of the excavation supporting plan for the foundation of the coiling machine were described, which can provide reference for the design and construction for similar projects.
Keywords: coiling machine foundation; deep excavation; supporting

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!