某石油专用管工程主厂房地基处理及基础设计
于春杰, 蒙 瑜, 罗福盛
摘 要

    于春杰,  蒙  瑜,  罗福盛
    (中冶赛迪工程技术股份有限公司,重庆400013)
[摘要] 概述了某石油专用管工程地基处理方案,重点分析了3:7灰土的运用,并对桩基方案和3:7灰土换填方案进行了技术、经济比较,可供同类工程设计参考。
[关键词] 换填;灰土;比较
中图分类号:TU318 +.2    文献标识码:A    文章编号:1002-848X( 2011) S2-0390-02

    Foundation treatment and design of specified OCTG project main workshop building
   
Yu Chunjie, Meng Yu, Luo Fusheng
    ( CISDI Engineering Technology Co., Ltd., Chongqing 400013, China)

Abstract: The foundation treatment proposal for specified OCTG (Oil Countryside Tubular Goods)  projects was described, and application of lime oil by ratio of 3:7 was mainly analyzed. Comparison between piling foundation and replacement and refilling of 3:7 lime soils was made in terms of their technology and econonuc figures. The analyses and results were expected to provide reference to similar engineering design.
Keywords: replacement and refilling; lime soil; comparison