- 摘 要
-
李 斌, 刘 俊, 李世勇, 许晋平
(香港华艺设计顾问(深圳)有限公司,深圳 518031)[摘要] 主要介绍了带转换层的超高层住宅抗震设计过程,包括抗震缝设置,结构体系布置,构件截面及材料,抗震性能目标设定,弹性计算分析比较,静力弹塑性计算分析,楼板应力分析,45。方向分析比较等。经过三阶段设计,达到抗震性能目标。
[关键词] 转换层;超高层住宅;滑动铰支座;450方向计算
中图分类号:TU375 文献标识码:A 文章编号:1002-848X(2011) Sl-0057-05Seismic Design of out-of-codes high-rise brulding in Longhua Zhonghang Plaza
Li Bin, Liu Jun, Li Shiyong, Xu Jinping
( Hong Kong Hua Yi Design Consultants(S.Z.)Ltd, Shenzhen 518031, China)Abstract: This article described the seisnuc design process of the super high-rise residential buildings with transfer story, including seismic joints, the structural layout, structural member section and materials, seismic performance objectives identified, analysis of elastic calculation, calculation of static plastic-elastic analysis, stress analysis of floor and analysis of seismic load in 450direction. A three-stage design has been performed to meet the seismic performance objectives.
Keywords: transfer story; super high-rise residential; sliding hinge support; 45 0 direction calculation