盛世新天地2#楼地基砂卵石换填与桩基处理方案比选
- 摘 要
-
马太雷, 职立军, 李闪闪
(洛阳新天地置业集团有限公司,洛阳 471000)[摘要] 盛世新天地2#楼工程基底下卵石持力层中夹有3~5m厚的性质不良的粉质黏土,经承载力及变形验算可知,不符合相关规范的要求,需要处理。对地基采用级配砂卵石换填和筏板下桩基两种方案处理后的沉降及造价进行了比对,并给出了结果。
[关键词] 级配砂卵石;冲击成孔灌注桩;工程造价
中图分类号:TU470.3 文献标识码:A 文章编号:1002-848X(2012) Sl-0856-02
A comparison research of changing and filling with sandy gravel or the piles in the foundation treatment of the New World of Prosperous Times's 2# Building
Ma Tailei, Zhi Lijun, Li Shanshan
( Luoyang New World Real Estate Group Co., Ltd., Luoyang 471000, China)
Abstract: The bearing stratum exists a bad quality cam-clay wluch is about three to five meters thick. It is bearing capacity and deformation can not satisfy the technical code, so the ground is required treated. The settlement and project cost of the two methods - changing and filling with sandy gravel or the piles were compared, and the final result was given.
Keywords: sandy gravel; cast-in-situ bored pile; project cost