您现在的位置:建筑结构>> 期 刊>> 2012年>> 增刊01期>>正文内容
某大跨机房的结构设计
曹 龙, 闫 军, 邹 宏
摘 要

   曹  龙,  闫  军,  邹  宏
   (中国航空规划建设发展有限公司,北京 100120)

[摘要] 某机房是钢筋混凝土框架结构,工程具有错层多,跨度大,荷载重,结构重要性高等特点。介绍变厚度筏板基础的设计,30m大跨度楼盖的设计选型及型钢混凝土梁的设计难点。为提高大震下结构的整体抗震性能,工程采用软钢阻尼器进行耗能,并进行弹塑性动力时程分析。
[关键词] 大跨度;型钢混凝土梁;变厚度筏板;软钢阻尼器;弹塑性动力时程分析
中图分类号:TU352.1    文献标识码:A    文章编号:1002-848X(2012) Sl-0393-03

Structural design of a calculator room with a large span
Cao Long, Yan Jun, Zou Hong
( China Aviation Planning and Construction Development Co., Ltd., Beijing100120, China)

Abstract: A calculator room project, which has multi-staggered floor, large span and heavy load, and lugh structural importance, was reinforced concrete frame structure. The design of variable thickness of the raft foundation, type selection of 30m large-span floor slab and the difficulties of steel reinforced concrete beams were mainly introduced. In order to improve the overall seismic performance of the structure under strong earthquakes, energy consumption by mild steel damper was used ,and elastic plastic dynamic time-history analysis was performed.
Keywords: large span; steel reinforced concrete beams; variable tluckness of the raft foundation; mild steel damper; elastic plastic dynamic time-history analysis

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!