广州某国际金融中心超限高层结构设计
- 摘 要
-
林瑶明,林凡,方小丹,韦宏(华南理工大学建筑设计研究院,广州 510640)[摘要]广州某国际金融中心为高度170m的超限高层建筑,采用钢管混凝土柱框架混凝土筒体结构体系。采用SATWE,ETABS进行多遇地震作用和风荷载作用下结构的计算分析,采用SATWE进行弹性时程分析,采用PUSH&EPDA进行大震下的静力弹塑性推覆分析(Pushover)和动力弹塑性时程分析;同时用ETABS分析了楼板在小震、中震及大震作用下的应力。计算结果表明该结构满足规范的各项要求,并采取了一些构造加强措施,可供同类工程参考。[关键词]超限高层建筑;混凝土柱;弹塑性分析;时程分析;加强措施中图分类号:TU355文献标识码:A文章编号:1002-848X(2012)07-0017-05Structure design on ultra-limit high-rise building of an international financial center in GuangzhouLin Yaoming, Lin Fan, Fang Xiaodan, Wei Hong(Architectural Design & Research Institute of South China University of Technology, Guangzhou 510640, China)Abstract: An international financial center in Guangzhou is a ultra-limit high-rise building of 170 meters high, with concrete filled steel tubular (CFST) column-concrete corewall structure system. The structure was analyzed by SATWE and ETABS under frequent earthquake and wind load. The elastic time history analysis under frequent earthquake by SATWE, elastic-plastic static analysis (Pushover) and elastic-plastic dynamic analysis (EPDA) under rare earthquake by PUSH&EPDA were carried out. The stress of floor under several earthquake cases was analyzed by ETABS. The results meet requirements of technical codes and some strengthening measures-have also been used to ensure the security of the structure. It can be a reference for other similar projects.Keywords: ultra-limit high-rise building; concrete filled steel tubular (CFST) column; elasticplastic analysis; time history analysis; strengthening measure作者简介:林瑶明,硕士,高级工程师,Email:gzlym@263.net。参考文献[1]方小丹,黄圣钧,李少云. RC梁-圆钢管混凝土柱节点环梁承载力设计方法[J]. 建筑结构学报,2008,29(5): 2-15.[2]广东三诚国际金融中心工程场地地震安全性评价报告[R].广州:广东省地震工程勘测中心,2008.