- 摘 要
-
(陕西省建筑科学研究设计院 710082)
【提要】 某住宅楼由于地基浸水湿陷发生不均匀沉降裂缝事故。介绍了该事故的检测鉴定、地基加固方法选择、坑式静压桩托换加固方案设计和地基加固施工情况,并在试验数据的基础上指出了用坑式静压桩法托换加固地基基础存在的桩顶压力滞后的问题。
【关键词】 裂缝 不均匀沉降 静压桩托换 压力滞后
Detection and Appraisal on Cracks in a Residential Building and Underpinning/Li Lin, Zhang Huilin(Shanxi Province Institute of Building Research,Xi'an 710082,China)
Abstract:Cracks in walls of a residential building are found, aroused by the dif
ferential settlement of the collapsible loess groundsill. The detection and appr
aisal on cracks,the selection of strengthening method,the designing and constr
ucting of static pile underpinning are introduced. Basing on the testing date,i
t is indicated that the pressure of the pile's top lags after the construction o
f the static pile.
Keywords:cracks;differential settlement;static pile underpinning;pressure lags