天津高银117大厦基础设计研究
- 摘 要
-
周建龙,包联进,童骏,陈建兴,徐小华,吴江斌,徐志敏,陆道渊(华东建筑设计研究院有限公司,上海 200002)[摘要]天津高银117大厦结构高度587m,是目前国内在建的结构高度最高的超高层建筑。塔楼采用钢筋混凝土核心筒-巨型框架支撑结构。塔楼地处软土地区和高地震烈度区,建筑高宽比达到9.0,竖向荷载作用下巨柱最大轴力1 000MN,工程桩有效桩长75m,基础筏板厚度6.5m。超高层建筑物的这些特点给基础设计带来极大挑战。主要介绍了塔楼基础设计的关键技术,包括桩型选择和布置、基础筏板的沉降和内力分析、巨柱柱脚构造。另外,对基础埋深、结构嵌固端以及筏板冲切等若干问题进行了探讨。[关键词]基础埋深;嵌固端;基础筏板;冲切;巨柱柱脚节点;施工可行性中图分类号:TU398-9文献标识码:A文章编号:1002-848X(2012)05-0019-05Foundation design and analysis of Tianjin 117 TowerZhou Jianlong, Bao Lianjin, Tong Jun, Chen Jianxing, Xu Xiaohua, Wu Jiangbin, Xu Zhimin, Lu Daoyuan(East China Architectural Design & Research Institute Co, Ltd., Shanghai 200002, China)Abstract: Tianjin 117 Tower is the tallest building under construction in China with 587m height. Concrete core and mega braced tube system is adopted to resist wind load and earthquake action. The high-rise building lies in the soft soil area and high density seismic zone. The aspect ratio is 9.0 and the maximum axial force in the mega column is about 1 000MN. The pile is of 75m length and the raft is of 6.5m thickness. These characteristics of the building bring challenges to the foundation design. The main technical issues on the foundation design, such as pile options, analysis on the settlement and moment of raft, as well as the detail of mega column-base, were introduced. In addition, the views were also presented including buried depth, fixing location and punch capacity of raft.Keywords: buried depth of the foundation; fixing location; raft foundation; punch capacity; detail of mega column-base; constructability作者简介:周建龙,教授级高工,Email:jianlong_zhou@ecadi.com。参考文献[1] ARUP,华东建筑设计研究院有限公司.高银117大厦超限设计专家审查报告[R].2010, 4.[2] JGJ 3—2010高层建筑混凝土结构技术规程[S]. 北京:中国建筑工业出版社,2011.[3] GB 50010—2010混凝土结构设计规范[S]. 北京:中国建筑工业出版社,2010.[4] 包联进,姜文伟,孙战金. CCTV新台址主楼外筒关键节点设计与构造[J]. 建筑结构学报, 2008, 29 (3):82-87.