您现在的位置:建筑结构>> 期 刊>> 2003年>> 第06期>>正文内容
庆化开元高科大厦转换结构设计
王 敏 李 兵 曾凡生 谈燕宁
摘 要

王  敏  李  兵  曾凡生  谈燕宁
(中国建筑西北设计研究院  西安 710003)

[提要]  庆化开元高科大厦是B级高度的复杂高层建筑结构,其建筑竖向上的结构转换层与建筑使用功能转换层不在同一层,且结构转换层上下两部分的轴网早45相交,这给结构设计带来了较大的难度。重点介绍了转换层的选型、整体计算模型的处理,并提供了控制转换层上下层等效剪切刚度比、层间侧向刚度比的有效方法,很好地处理了建筑转换层、设备转换层、结构转换层之间的关系。
[关键词]  复杂结构  超限高层  箱形结构转换层  转换层  等效剪切刚度比  层间侧向刚度比

Qinghua kaiyuan high-tech mansion is a complex high-rise building with B gracle height. Structural transfer story and that for facility are not in the same floor, and the axis nets of the two structural parts on and under the transfer story areintersectant in 45angle, which make structural design more difficult. How to choose the transfer structure and clispose the total computation model is mainly discussed. In addition, the efficient methods for controlling the equivalent shear stiffness ratio between the upper and the lower one of the transfer story and the interlayer lateral stiffness ratio are also investigated, which well solves the setting of the architectural transfer story, the structural one and that for facility.
Keywords: complex highrise building; transfer story; equivalent shear stiffness ratio; interlayer lateral stiffness ratio

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!