您现在的位置:建筑结构>> 期 刊>> 2004年>> 第06期>>正文内容
钢结构加腋型梁柱焊接节点抗震性能的探讨
黄第云 王立君 张俊宝
摘 要

   黄第云  王立君  张俊宝 (天津大学材料学院 300072)

[提要]  介绍了钢结构加腋型梁柱焊接节点的结构、形状、主要参数与重要部件,并对其抗震性能进行了探
讨。加腋型节点的塑性铰在远离柱翼缘面的梁上形成。与一般的梁柱节点相比,其韧性行为稳定,强度得到提高。与目前流行的削弱梁截面的改进型节点比较,加腋型梁柱焊接节点具有更大的塑性转角与更强的抗震性能。
[关键词]  钢结构  加腋  梁柱节点  塑性铰  抗震性能

The configuration,shape,main parameters and important components of beam-column welded connection with welded haunch in steel moment-frame are presented,and its aseismic performance is discussed. Studies indicate that the connection with welded haunch shifts plastic hinge away from the face of the column. Compared with normal connection, this connection has a steady performance of the ductility,its strength is also improved, and achieves larger plastic rotation than that with RBS( Reduced Beam Section), therefore, has better aseismic performance.
Keywords: steel frame; haunch; beam-column connection; plastic hinge; aseismic performance

    参  考  文  献

1 .  Engelhardt M D,Sabot T A. Seismic-resistant steel moment connections: development since the 1994 Northridge earthquake. Construction Research Communications Limited, 1997 ISSN; 1365-0556.
2.  Yu Q S, Uang C M, Gross J. Seismic rehabilitation design of steel moment connection with welded haunch.JournaL of Structural Engineering,2000,126(1):69-78.
3.  Miller D K. Lessons Learned from the Northridge earthquake. Engineering Structure, 1998, ( 20 ) : 249-260.
4. Uang C M, Bondad D. Dynamic testing of pre-Northridge and haunch repaired steel moment connections. Rep. No. SSRP-96/03, Final Rep. Prepared for NSF, Univ.  of California, San Diego, Calif,
 1996.
5.  Uang C M, Bondad D. Static cyclic testing of pre-Northridge and haunch repaired steel moment connections. Rep. No. SSRP-96/02, FinaL Rep. Prepared for SAC, Univ.  of California, San Diego,Calif,
1996 .
6 .赵大伟 ,石永久 ,陈宏.低周往复载荷下梁柱节点的验研究. 建筑结构,2000,30(9).
7.  Civjan S A. Experimental testing of retrofit steel moment connctions. Invited Presenter and Participant, Connections in Steel Structures IV: Steel Connections in the New Millennium international,
Roanoke, Virginia, 2000 .
8.  Shuey B, Engelhardt M D. Testing of repair concepts for damaged steel moment connections. SAC Report, 1996 .
9.  Uang C M, Bondad D. Static cyclic testing of Pre-Northridge and haunch repaired .steel moment connections. SAC Report, 1996.
10.  Uang C M, Yu Q S, Noel S. Rehabilitating pre-Northridge steel moment frame connections: RBS and haunch approaches con.sidering slab effects. In: Proceedings: 6th US National C,onference on Earth-quake Engineering, Earthquake Engineering Research Institute, 1998 .
11.  Narayanan R. Design development in Long span flooring system in the UK. In: Proceedings, International Conference on Steel and Aluminium Structures, ICSAS91 , Singapore, London: El.sevier; 1991 .
12.  Liew J Y R. A resource book for structural steel design and construction. Singapore: SSSS/BCA Joint Publication, 2001 .
13 .  Lawson R M, Rackham J W. Design of haunched composite beam in buildings. Publication 060,The Steel Con.struction Institute, Ascot, 1989 .
14.  Lee C H, Uang C M. Analytical modeling of dual panel zone in haunch repaired steel MRF.s. Journal of Structural Engineering, 1997,123(1):20-29.
15.  Tanaka N. Evaluation of maximum strength and optimum haunch length of .steel eam-end with horizontal haunch. Engineering Structures,2003,(25):229-239.
16.  Uang C M, Yu Q S, Noel S, et al. Cyclic testing of steel moment connections rehabilitated with RBS or welded haunch. Journal of Structural Engineering, 2000, 126( 1 ) : 57-68 .
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!