- 摘 要
-
张志强 (云南怡成建筑设计有限公司 昆明 650032)
[提要] 简要介绍了在昆明“湖畔之梦”工程中引进混凝土管桩所面临的问题。结合与预制方桩的比较,针对昆明8度抗震设防及滇池湖畔饱和非均匀性软土地基薄壁管桩( PTC)桩基抗震进行了专门验算。为解决地方标准(如浙江、宁波标准)对高烈度区限制管桩应用问题进行了探索与尝试,提出了相关设计建议。
[关键词] 混凝土管桩8度区 软土地基 桩基水平承载力 抗震验算The superiority of reinforced spun concrete tubular pile and the problems are introduced, which appear in project "the dream of Hupan" in Kunming. Comparing with the precast concrete square pile, the aseismatic intensity checking computations is made for the featheredged concrete tubular pile applied in the heterogeneous soft foundation near the Dianchi Lake at the 8-degree seismic fortification intensity.The problems of the first application for the concrete tubular pile in some high intensity regions restricted by some local stanclards( such as Zhejiang standard)are tried to solve.
Keywords: reinforced spun concrete tubular pile; the horizontal bearing; soft foundation; aseismatic design参 考 文 献
1.先张法预应力混凝土管桩( (GB13476-1999).
2.先张法预应力离心混凝土管桩制作技术规程( YBJ237-91)
3.预应力混凝土管桩基础技术规程( DJB/T15-22-98).
4.先张法预应力混凝土管桩( DBJT08-92-2000) (图集号:2000 沪 G502).
5.先张法预应力混凝土管桩(图集号:99 浙 G22).
6.宁波市建筑标准设计通用图集先张法预应力混凝土管桩(DBJ02-10-99).
7.预制钢筋混凝土方桩( 97G361).
8.阮起楠.预应力混凝土管桩, 中国建材工业出版社,2000.
9.建筑桩基技术规范(JGJ94-94).
10.建筑抗震设计规范(GB50011-2001).