您现在的位置:建筑结构>> 期 刊>> 2022年>> 第15期>>正文内容
杭州亚运会拳击场馆杭州体育馆提升改造工程结构加固设计∗
李晓良, 杨学林, 郜海波, 周平槐, 丁 浩
摘 要

(浙江省建筑设计研究院, 杭州 310006)

摘要: 杭州体育馆建于 20 世纪 60 年代末,是我国较早建成的马鞍形悬索屋面体育建筑,至今已超过一般建筑 50年的设计使用年限,作为历史保护建筑,其将继续使用,并将作为 2022 年杭州亚运会拳击比赛主场馆。 根据后续使用年限 30 年的 A 类建筑结构安全性和抗震性能鉴定结果及提升改造后的建筑功能要求,分析了上部承重结构体系不合理之处及需要加固的结构构件。 采用综合抗震能力验算的方法,分别从地基基础、结构体系、结构构件、梁柱节点、屋面索网结构等方面对本工程进行了结构加固改造设计。 同时,鉴于原建筑按非抗震设计,本工程采用性能化设计的思路,通过利用结构构件抗震承载力冗余度,放宽部分构造要求从而缩小加固范围、节约成本、缩短工期,同时最大限度减轻结构加固对原有建筑的影响,实现对历史建筑的保护。

关键词: 杭州亚运会; 杭州体育馆; 历史保护建筑; 后续使用年限; 性能化设计; 加固改造

中图分类号:TU318+. 2 文献标志码:A 文章编号:1002-848X(2022)15-0091-07

DOI:10. 19701 / j. jzjg. ZIAD2208

Structural reinforcement design of Hangzhou Gymnasium upgrading and reconstruction projectfor Asian Games Hangzhou boxing venue

LI Xiaoliang, YANG Xuelin, GAO Haibo, ZHOU Pinghuai, DING Hao

( Zhejiang Province Institute of Architectural Design and Research, Hangzhou 310006, China)

Abstract: Built in the late 1960s, Hangzhou Gymnasium is a saddle-shaped suspended roof sports building built earlier inChina. It has exceeded the design service life of general buildings for 50 years, as a protective historical building, it willcontinue to be used for Asian Games Hangzhou 2022 boxing competition. According to the appraisal results of the safety andseismic performance of the class A building with a subsequent service life of 30 years and the functional requirements of theupgraded building, the unreasonable load-bearing structure system of the superstructure and the structural components thatneed to be reinforced were analyzed. By adopting the method of comprehensive seismic capacity checking, the structuralreinforcement and reconstruction design of this project was carried out from the aspects of foundation, structural system,structural components, beam-column joints, roof cable-net structure and so on. At the same time, in view of thenon-seismic design of the original building, this project adopted the idea of performance-based design. By using theredundancy of seismic bearing capacity of structural components,some structural requirements was relaxed. Thus, the scopeof reinforcement was reduced, the cost was saved and the construction period was shortened. The influence of structuralreinforcement on the original building was minimized, and the protection of historical buildings was achieved.

Keywords: Asian Games Hangzhou; Hangzhou Gymnasium; protective historical building; subsequent service life;performance-based design; reinforcement and reconstruction

∗浙江省建设科研项目(2021K128) 。

第一作者:李晓良,硕士,正高级工程师,一级注册结构工程师,主要从事建筑结构设计与研究,Email:735631859@ qq. com。

[引用本文] 李晓良,杨学林,郜海波,等. 杭州亚运会拳击场馆杭州体育馆提升改造工程结构加固设计[ J] . 建筑结构,2022,52(15) :91-97. LI Xiaoliang,YANG Xuelin,GAO Haibo,et al. Structural reinforcement design of HangzhouGymnasium upgrading and reconstruction project for Asian Games Hangzhou boxing venue[ J] . Building Structure,2022,52(15) :91-97.

下载地址