大跨钢⁃混凝土组合梁斜拉桥施工阶段受力性能分析
田引安
摘 要

(中铁第一勘察设计院集团有限公司, 西安 710043)

摘要: 为了研究大跨钢⁃混凝土组合梁斜拉桥在施工过程中主梁与主塔的内力及位移变化规律,以江西药都大桥为例,采用 ANSYS 软件建立三维精细化有限元模型,对此钢⁃混凝土组合梁斜拉桥进行了施工过程数值分析。 计算结果表明:在主桥最大单悬臂状态、合龙和桥面铺装后,主梁与主塔的应力、变形均满足相关规范要求。 考虑斜拉索自重影响,通过 Ernst 公式对斜拉索的弹性模量进行修正,分析了几何非线性对结构内力和变形的影响。 分析结果表明:随着斜拉索长度的不断变长,垂度效应越来越明显,尤其跨中斜拉索之间的主梁弯矩受到的影响较大,施工到桥合龙阶段,相对考虑垂度效应,不考虑垂度效应时,塔根部主梁弯矩减小 1􀆰 6%;结构大位移及 P⁃δ 效应对主梁跨中挠度影响不超过 4%。

关键词: 大跨钢⁃混凝土组合梁斜拉桥; 施工过程; 悬臂拼装; 垂度效应; 大位移效应; 荷载⁃位移效应

中图分类号:TU398,U443 文献标志码:A 文章编号:1002⁃848X(2022)12⁃0121⁃06

[引用本文] 田引安. 大跨钢⁃混凝土组合梁斜拉桥施工阶段受力性能分析[ J]. 建筑结构,2022,52(12):121⁃126.TIAN Yin′ an. Mechanical performance analysis of long⁃span steel⁃concrete composite beam cable⁃stayed bridge duringconstruction[J]. Building Structure,2022,52(12):121⁃126.

 

DOI:10􀆰 19701 / j.jzjg.YG220639

 

Mechanical performance analysis of long⁃span steel⁃concrete composite beam cable⁃stayedbridge during construction

TIAN Yin′an

(China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, China)

Abstract: In order to study the internal force and displacement variation law of main girder and main tower of long⁃span steel⁃concrete composite beam cable⁃stayed bridge during construction, taking Jiangxi Yaodu Bridge as an example, the three⁃dimensional refined finite element model was established by ANSYS software, and the construction process of the steel⁃concrete composite beam cable⁃stayed bridge was numerically analyzed. The calculation results show that after the maximum single cantilever state, closure and deck pavement of the main bridge, the stress and deformation of the main beam and the main tower meet the requirements of the relevant specifications. Considering the influence of self⁃weight of stay cable, the elastic modulus of stay cable was corrected by Ernst formula, and the influence of geometric nonlinearity on internal force and deformation of structure was analyzed. The analysis results show that the sag effect becomes more and more obvious with the continuous increase of the length of the stay cable, especially the bending moment of the main beam between the mid⁃span stay cables is greatly affected. When the construction reaches the closure stage of the bridge, the bending moment of the main beam at the root of the tower decreases by 1􀆰 6% compared with that considering the sag effect and without considering the sag effect. The influence of structural large displacement and P⁃δ effect on the mid⁃spandeflection of the main beam is not more than 4%.

Keywords:steel⁃concrete composite beam cable⁃stayed bridge; construction process; cantilever erection; sag effect; largedisplacement effect; load⁃displacement effect

∗山区浅滩跨江大跨度悬索桥关键技术研究(TFSH⁃HJ.B⁃KY⁃1903⁃039)。
第一作者:田引安,学士,高级工程师,主要从事道路总体设计、路线及互通设计、道桥工程方向的研究,Email:88404303@qq.com。
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!