上海黄浦路 106 号历史保护建筑改造项目托换顶升隔震设计∗
苏 骏, 周建龙, 周 健, 吴江斌, 刘健强
摘 要

(华东建筑设计研究院有限公司, 上海 200002)

摘要: 黄浦路 106 号历史保护建筑“红楼”为三层砖木结构,根据周边规划要求,需整体提升 6m,底部增加一层.介绍了针对这些改造所采取的特殊应对措施及其设计方法,包括:采用桩基础整体托换主动保护方案,解决建筑局部倾斜的问题;整体顶升为增层提供条件,增层下设置隔震层,减小原砌体结构各层层间剪力,使其小于顶升前后砌体结构各层层间剪力以及小于原有砌体结构各层水平抗剪能力,从而实现改造同时提升历史保护建筑的整体受力和抗震性能的目标.

关键词: 红楼; 历史保护建筑; 主动保护方案; 桩基础托换; 结构整体顶升; 隔震支座; 黏滞阻尼器

中图分类号:TU242. 9 文献标志码:A 文章编号:1002-848X(2022)09-0139-08

DOI:10. 19701 / j. jzjg. HDY2231

Underpinning lifting and isolation design of historical protection building reconstruction project atNo. 106 Huangpu Road in Shanghai

SU Jun, ZHOU Jianlong, ZHOU Jian, WU Jiangbin, LIU Jianqiang

(East China Architectural Design & Research Institute Co. , Ltd. , Shanghai 200002, China)

Abstract: The historical protection building in No. 106 Huangpu Road is a three-story brick-timber structure. According tothe surrounding planning requirements, it needs to be lifted 6m, with an additional layer at the bottom. The specialcountermeasures and design methods adopted for these modification was introduced, including the overall underpinningactive protecting the pile foundation scheme to solve the problem of local leaning of the building. The overall lifting providesconditions for adding floors. Isolation layer was added to the new floor, which reduces the shear force between each layer ofthe original masonry structure, making the interlayer shear force smaller than each layer of the masonry structure before andafter lifting, and less than each layer of the horizontal shear capacity of the original masonry structure so as to achieve thegoal of improving the overall force and seismic performance of the historical protection building at the same time.

Keywords: red building; historical protection building; active protection scheme; underpinning of pile foundation;structural overall lifting; isolation bearing; viscous damper

∗上海市社会发展科技攻关项目(20DZ1202402) .

第一作者:苏骏,学士,教授级高级工程师,主要从事结构设计工作,Email:sj0488@ ecadi. com.

[引用本文] 苏骏,周建龙,周健,等. 上海黄浦路 106 号历史保护建筑改造项目托换顶升隔震设计[ J] . 建筑结构, 2022, 52 ( 9 ) : 139-146. SU Jun, ZHOU Jianlong, ZHOU Jian, et al. Underpinning lifting and isolation design ofhistorical protection building reconstruction project at No. 106 Huangpu Road in Shanghai[ J] . Building Structure,2022,52(9) :139-146.