您现在的位置:建筑结构>> 期 刊>> 2023年>> 第09期>>正文内容
承压水对抗拔桩施工的影响及对策
韩 丽1, 夏长华2,3,4, 李德志5, 丁保华5, 江 宁2,3,4
摘 要

(1 北京大学医学部基建工程处, 北京 100191; 2 建筑安全与环境国家重点实验室, 北京 100013;3 中国建筑科学研究院有限公司地基基础研究所, 北京 100013; 4 北京市地基基础与地下空间开发利用工程技术研究中心, 北京 100013; 5 中国建筑技术集团有限公司, 北京 100013)

摘要: 针对某具体工程实例,通过磁测检测、取芯检测、开挖检测、静载试验试桩检测,分析了抗拔桩抗拔承载力不足的原因及承压水对抗拔桩带来的危害,指出承压水及抗拔桩施工工艺引起的桩侧摩阻力的降低是导致抗拔桩抗拔承载力不足的原因. 提出了具有承压水水文地质条件下抗拔桩施工工艺与质量控制措施即试桩、降止水、提高泥浆质量、采用后压浆工艺及增加上覆土,以期对类似工程地质及水文地质条件下抗拔桩的施工提供参考.

关键词: 承压水; 抗拔桩; 后压浆; 泥浆; 上覆土

中图分类号:TU318. 1 文献标志码:A 文章编号:1002-848X(2023)09-0137-04

DOI:10. 19701 / j. jzjg. 20222664

Influence of confined water on uplift pile construction and countermeasures

HAN Li1, XIA Changhua2,3,4, LI Dezhi5, DING Baohua5, JIANG Ning2,3,4

(1 Infrastructure Construction Department of Peking University Health Science Center, Beijing 100191, China;2 State Key Laboratory of Building Safety and Built Environment, Beijing 100013, China; 3 China Academy ofBuilding Research Foundation Institute, Beijing 100013, China; 4 Beijing Engineering Technology ResearchCenter of Foundation and City Underground Space Development and Utilization, Beijing 100013, China;5 China Building Technique Group Co. , Ltd. , Beijing 100013, China)

Abstract:In view of a specific engineering example, the reasons for the insufficient uplift bearing capacity of uplift pilesand the harm caused by confined water to uplift piles were analyzed through magnetic testing, core testing , excavationtesting, and static load test pile testing . It is pointed out that the reduction of pile side friction resistance caused byconfined water and the construction technology of uplift piles is the reason for the insufficient uplift bearing capacity of upliftpiles. The construction technology and quality control measures of uplift piles under hydrogeological conditions of confinedwater were put forward, namely test pile, dewatering and water sealing, improving mud quality, adopting post groutingtechnology and increasing overlying soil in order to provide reference for the construction of uplift piles under similarengineering geology and hydrogeological conditions.

Keywords:confined water; uplift pile; post grouting; slurry; overlying soil

第一作者:韩丽,硕士,工程师,主要从事工程管理工作,Email: hanli@ bjmu. edu. cn.

[引用本文] 韩丽,夏长华,李德志,等. 承压水对抗拔桩施工的影响及对策[ J]. 建筑结构,2023,53(9):137-140.HAN Li,XIA Changhua,LI Dezhi,et al. Influence of confined water on uplift pile construction and countermeasures[ J].Building Structure,2023,53(9):137-140.

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!