您现在的位置:建筑结构>> 期 刊>> 2021年>> 第21期>>正文内容
洛阳隋唐城应天门遗址保护建筑基础拉杆设计
徐珂1,姬浩杰2,梁岩3
摘 要

(1 清华大学建筑设计研究院有限公司, 北京 100084;2 河南六建建筑集团有限公司, 洛阳 471001;3 郑州大学土木工程学院, 郑州 450001) 

[摘要]隋唐城应天门遗址保护建筑采用桩基础,桩顶设置承台支撑上部斜柱框架。在不能开挖遗址的情况下,采用暗挖顶管工艺施工基础预应力拉杆,平衡基础间水平推力。先后介绍了预应力拉杆的组成、预应力张拉次数、预应力张拉比例和顺序、桩顶水平位移控制目标等设计原则,以及预应力拉杆的施工方案及施工控制方法,并根据施工监测结果及施工模拟结果对施工方案进行了调整。结果表明:施工过程中桩顶水平位移均满足既定目标,且变化趋势与施工模拟结果吻合。 

[关键词]洛阳隋唐城应天门遗址;遗址保护;暗挖顶管;预应力拉杆;施工监测 

中图分类号:TU318 文献标识码:A文章编号:1002-848X(2021)21-0129-07

 

Foundation tie rod design of the conservation building of YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasties 

XU  Ke1,  JI  Haojie2,  LIANG  Yan3 

(1 Architectural Design & Research Institute of Tsinghua University Co., Ltd., Beijing 100084, China;2 Henan Six Construction Group, Luoyang 471001, China;3 School of Civil Engineering, Zhengzhou University, Zhengzhou 450001, China) 

Abstract: Pile foundation was used in the conservation building of YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasties. The pile cap was set to support the upper inclined column frame. As the site could not be excavated, the prestressed tie rod between foundations was constructed by underground excavation and pipe jacking technology to balance the horizontal thrust between foundations. The composition of the prestressed tie rod were introduced, the number of prestressed tension, the proportion and sequence of prestressed tension, the horizontal displacement control target of pile top and other design principles were introduced successively, as well as the construction scheme and construction control method of the prestressed tie rod were introduced. According to the comparison of construction monitoring and construction simulation results, the construction scheme was adjusted. The results show that the horizontal displacement of pile top meets the established target during construction, and the variation trend is consistent with the construction simulation results. 

Keywords:YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasty; archaeological site protection; underground excavation and pipe jacking; prestressed tie rod; construction monitoring

 

作者简介:徐珂,硕士,教授级高级工程师,一级注册结构工程师,Email:15601060166@126.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!