您现在的位置:建筑结构>> 期 刊>> 2021年>> 第09期>>正文内容
不同榫卯板构造的装配整体式剪力墙抗震性能试验研究*
初明进1,陈国尧1,刘继良3,曹春利1,2,李祥宾1,李爱群1
摘 要

(1 北京建筑大学北京未来城市设计高精尖创新中心, 北京 100044;2 山东艾科福建筑科技有限公司, 烟台 264006; 3 大连理工大学土木工程学院, 大连 116024)

[摘要]对1个现浇钢筋混凝土剪力墙试件和2个装配整体式剪力墙剪力墙试件进行拟静力试验,研究剪跨比为1.5的装配整体式剪力墙的抗震性能以及榫卯板构造对榫卯接缝的连接性能的影响。结果表明:榫卯接缝整体性良好,接缝开裂时试件位移角远大于1/1 000;装配整体式剪力墙的破坏区域主要集中在榫卯接缝处,峰值荷载时墙体根部混凝土基本完好,承载力低于现浇钢筋混凝土剪力墙,但刚度退化速率小于现浇钢筋混凝土剪力墙,变形能力、累计耗能大于现浇钢筋混凝土剪力墙,峰值荷载后装配整体式剪力墙进入墙柱组合体受力阶段,承载力下降减缓,位移角达到1/25时仍保持水平和竖向承载力;榫卯板横向凹槽底部与竖向孔洞内侧是否平齐对墙体承载力基本没有影响,但平齐构造可延缓榫卯接缝破坏,有助于提高墙体的刚度和耗能能力。

[关键词]装配整体式剪力墙;榫卯板;榫卯接缝;预制边缘构件;抗震性能;连接性能

中图分类号:TU973-1+6,TU317+.1文献标识码:A文章编号:1002-848X(2021)09-0007-08

 

Experimental study on seismic behavior of assembled monolithic shear walls with different mortise-tenon joints of wallboards

CHU Mingjin1 , CHEN Guoyao1 , LIU Jiliang3 , CAO Chunli1,2, LI Xiangbin1, LI Aiqun1

(1 Beijing Advanced Innovation Center for Future Urban Design, Beijing University of Civil Engineering and Architecture, Beijing 100044, China; 2 Shandong Aikefu Building Technology  Co., Ltd., Yantai 264006, China; 3 School of Civil Engineering, Dalian University of Technology, Dalian 116024, China)

Abstract:The pseudo-static tests of one cast-in-situ reinforced concrete shear wall specimen and 2 assembled monolithic shear wall specimens were carried out to study the seismic behavior of the assembled monolithic shear wall with the shear span ratio of 1.5 and the influence of mortise-tenon structure on the connection performance of mortise-tenon joints. The results show that the mortise-tenon joint has good integrity, while the joints cracke, the displacement angle of specimens is much greater than 1/1 000. The damage area of assembled monolithic shear wall mainly concentrate on the mortise-tenon joints, and under the peak load, the concrete at the root of the wall is basically intact, the bearing capacity of assembled monolithic shear wall is lower than that of the cast-in-situ reinforced concrete shear wall, but stiffness degradation rate is less than that of the cast-in-situ reinforced concrete shear wall, deformation behavior and cumulative energy dissipation are greater than that of the cast-in-situ reinforced concrete shear wall, after the peak load, the assembled monolithic shear wall enters the stress stage of the wall-column combination, which delays the decrease of the bearing capacity, and the horizontal and vertical bearing capacity remains when the displacement angle reaches 1/25. In addition, whether the inner side of vertical hole and the bottom of transverse groove is in the same plane has no effect on the bearing capacity of the wall, but when the structure’ design is in the same plane, it can delay the damage of the mortise-tenon joints, which can help improve the stiffness and the energy dissipation of the wall.

Keywords:assembled monolithic shear wall; wallboard with mortise-tenon joint; mortise-tenon joint; precast edge element; seismic behavior; connection performance

 

*国家自然科学基金项目(51778034),山东省自然科学基金(ZR2018PEE024),北京市属高校基本科研业务费专项资金资助(X18179,X19003)。

 

作者简介:初明进,博士,教授,博士生导师,Email: chumingjin@bucea.edu.cn;通信作者:李爱群,博士,教授,博士生导师,Email: liaiqun@bucea.edu.cn。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!