您现在的位置:建筑结构>> 期 刊>> 2021年>> 第03期>>正文内容
西安站改扩建工程跨地裂缝结构概念设计及措施研究*
蔡玉军
摘 要

(中铁第一勘察设计院集团有限公司, 西安 710043)

[摘要]在西安站改扩建工程中,西安f3地裂缝从西安站车场斜向穿过,其中高架候车室、市政地下通廊及东配楼等建筑受其影响。采取了以下概念设计和措施来降低地裂缝对本工程的危害:整体设计上,采用了高架候车室与市政地下通廊分离式的布置方式,使得轨道层完全避开地裂缝的影响;高架候车室等上部结构采用上下盘基础避让,跨越地裂缝结构采用简支钢桁架连廊的方式,市政地下通廊通过分段设置将结构分成几段斜交箱涵结构,以适应地裂缝变形要求。通过整体概念设计、有限元数值模拟及缩尺模型振动台试验表明,跨地裂缝简支钢桁架连廊可适应地裂缝及大震的变形,达到“大震不倒”的性能要求;市政地下通廊应力、应变均可满足地裂缝的变形要求。

[关键词]西安站;改扩建工程;钢桁架;斜交箱涵;振动台试验;地裂缝

中图分类号:TU352文献标识码:A文章编号:1002-848X(2021)03-0051-05

 

Study on concept design and measures of across ground fissure structure in reconstruction and extension project of Xi′an railway station

CAI Yujun

(China Railway First Survey & Design Institute Group Co., Ltd., Xi′an 710043, China)

Abstract:In the reconstruction and expansion project of Xi′an Railway Station,the f3 ground fissure crosses diagonally from the Xi′an Railway Station parking lot, and the buildings such as elevated waiting room, municipal underground corridor and east distribution building are affected by it. The following concept designs and measures was adopted to reduce the damage of ground fissures to the project: in the overall design, the separation layout of elevated waiting room and municipal underground corridor was adopted, so that the track layer can completely avoid the influence of ground fissures; the upper structure such as the elevated waiting room adopted the upper and lower wall foundation to avoid, and the structure crossing the ground fissure adopted the simply supported steel truss, the municipal underground corridor was divided into several sections of skew box culvert structure to adapt to the deformation requirements of ground fissures. Through overall concept design, finite element numerical simulation and scale shaking table model test, it is shown that the simply supported steel truss corridor across ground fissures can adapt to the deformation of ground fissures and large earthquakes, and meet the performance requirements of "no collapse in large earthquakes";the stress and strain of the municipal underground corridor can meet the deformation requirements of ground fissures.

Keywords:Xi′an railway station;reconstruction and extension project;steel truss;skew box culvert;shaking table test; ground fissure

 

*中铁第一勘察设计院集团有限公司科研项目(院科18-42、院科20-58)。

 

作者简介:蔡玉军,硕士,正高级工程师,一级注册结构工程师,Email:525980939@qq.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!