- 摘 要
-
(中信建筑设计研究总院有限公司, 武汉 430014)
[摘要]天津中信城市广场首开区地下室平面尺寸为528m×73m,为超长地下结构,采用逆作法施工。桩基方案选型优化确定采用框架柱与临时立柱相结合的“一柱一桩”方案,对逆作结构连接的关键节点进行了分析,考虑了超长结构的温度效应,并采取相应的设计措施。工程监测结果表明,结构沉降均匀稳定,楼板未出现明显的温度裂缝,达到了设计预期。
[关键词]天津中信城市广场; 逆作法; 超长结构; 一柱一桩; 连接节点; 温度效应
中图分类号:TU93+2文献标识码:A文章编号:1002-848X(2021)01-0036-05
Structural design of basement in the First Phase Project of Tianjin CITIC City Plaza
LOU Zefang, ZHANG Dasheng, YUAN Qiang, WEN Siqing, WANG Hai
(CITIC General Institute of Architectural Design and Research Co., Ltd., Wuhan 430014, China)
Abstract:The plan size of the basement in the First Phase Project of Tianjin CITIC City Plaza is 528m×73m. It is an ultra-long basement structure and was constructed by top-down construction method. The selection of pile foundation scheme was optimized and determined to adopt the “one column one pile” scheme combining frame columns and temporary columns. The key nodes of the top-down structure connection were analyzed, the temperature effect of the ultra-long structure was considered, and corresponding design measures were taken. The engineering monitoring results show that the structural settlement is uniform and stable, and there are no obvious temperature cracks in the floor, which meet the design expectations.
Keywords:Tianjin CITIC City Plaza; top-down construction method; ultra-long structure; one column one pile; connection joint; temperature effect
作者简介:娄泽方,硕士,高级工程师,Email:louzf_whu@163.com。