您现在的位置:建筑结构>> 期 刊>> 2020年>> 第19期>>正文内容
成都建工预筑科技研发中心装配式结构设计*
邓世斌1,许明姣1,毕琼1,雷雨1,吴靖1,孔文艺2,董博1,李波1
摘 要

(1 中国建筑西南设计研究院有限公司, 成都 610042;  2 成都建工预筑科技有限公司, 成都 610011)

[摘要]成都建工预筑科技研发中心采用装配整体式框架结构,装配率93%。结合十三五国家重点研发计划研究成果,以项目为例阐述了框架梁柱节点、密拼空心叠合板、双T板、外墙挂板节点等设计细节,为同类项目提供参考和借鉴。其中梁柱节点采取了一系列的措施,在满足承载力前提下,充分考虑节点区钢筋布置方式,方便预制构件制作和安装;  密拼空心叠合板和双T板的应用,避免了后浇带整体式接缝的钢筋桁架叠合板制作安装困难、支撑多、造价高等缺点;  外挂墙板节点不仅能满足承载力要求,而且能适应主体结构变形,安装方便。

[关键词]装配整体式框架结构;  高装配率;  密拼空心叠合板;  双T板;  外墙挂板节点

中图分类号:TU318文献标识码:A文章编号:1002-848X(2020)19-0117-07

 

Design of assembly structure in Chengdu Construction Engineering Pre-built Technology R&D Center

DENG Shibin1, XU Mingjiao1, BI Qiong1, LEI Yu1, WU Jing1, KONG Wenyi2, DONG Bo1, LI Bo1

(1 China Southwest Architectural Design and Research Institute Co., Ltd., Chengdu 610042, China; 2 Chengdu Construction Engineering Pre-built Technology Co., Ltd., Chengdu 610011, China)

Abstract:Chengdu Construction Engineering Pre-built Technology R&D Center adopts an integrated frame structure system, the assembly rate is 93%. Combined with the research results of 13th Five-Year National Key R&D Plan, the project was used as an example to illustrate the design details of frame beam-column joints, hollow close\|fitting composite slabs, double T slabs and external panel joints, providing reference for similar projects. Among them, a series of measures have been adopted for the beam-column joints. Under the premise of satisfying the bearing capacity, the arrangement of steel bars in the joint area is fully considered to facilitate the production and installation of prefabricated components; the application of hollow close-fitting composite slab and double T slab avoids post-casting belts Integral joint reinforced truss composite panels have disadvantages such as difficult production and installation, multiple supports, and high cost; external panel joints can not only meet the requirements of bearing capacity, but also adapt to the deformation of the main structure and are easy to install.

Keywords:assemble integral frame structure; high assembly rate; hollow close-fitting composite slab; double T slab; external panel joint

 

*“十三五”国家重点研发计划项目(2016YFC0701900)。

 

作者简介:邓世斌,硕士,高级工程师,Email:29383509@qq.com;  通信作者:许明姣,硕士,高级工程师,Email:835071966@qq.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!