- 摘 要
-
(中国建筑西南设计研究院有限公司, 成都 610042)
[摘要]济南市历下区文体档案中心为集剧场、游泳馆、篮球馆、档案馆、图书馆、科技馆等功能为一体的综合性建筑。本工程存在施工工序复杂、钢桁架受力复杂、楼板超长且不连续等设计难点。通过预应力混凝土梁、钢桁架、梁上柱、吊柱的合理设置,确保了大跨空间上方多层建筑功能的实现。通过细致的弹塑性分析,保证了结构抗震性能目标的实现。通过施工顺序的合理组织、桁架节点的精细分析,确保了大跨区域的安全可靠。通过楼板应力分析和适当的加强措施,有效解决了楼板超长和不连续的问题。
[关键词]历下区文体档案中心; 转换桁架; 施工顺序; 空腹桁架效应; 节点分析; 舒适度分析
中图分类号:TU398-2文献标识码:A文章编号:1002-848X(2020)19-0093-05
Difficulties and countermeasures in the structural design of Cultural and Sports Archives Center of Lixia District
ZHOU Jia, ZHOU Jinwei, WU Xiaobin, ZHAO Jian, ZHANG Hengfei, ZHOU Dingsong, JIN Sheng
(China Southwest Architectural Design and Research Institute Co., Ltd., Chengdu 610042, China)
Abstract:The Cultural and Sports Archives Center of Lixia District in Jinan City is a comprehensive building that integrates the functions of theater, swimming pool, basketball hall, archives, library, and science and technology museum. There are some design difficulties in this project, such as complex construction process, complex stress of steel truss, super long and discontinuous floor. Through the reasonable setting of prestressed concrete beam, steel truss, column on beam and hanging column, the realization of multi-storey building function above large span space is ensured. Through detailed elastic-plastic analysis, the seismic performance of the structure is guaranteed to achieve. Through reasonable organization of construction sequence and fine analysis of truss joints, the safety and reliability of large-span area are ensured. Through the stress analysis of the floor and appropriate strengthening measures, the problem of over length and discontinuity of the floor is effectively solved.
Keywords:Cultural and Sports Archives Center of Lixia District; transfer truss; construction sequence; open-web truss effect; joint analysis; comfort analysis
作者简介:周佳,硕士研究生,高级工程师,一级注册结构工程师,Email:zkc7@xnjz.com;通信作者:赵建,硕士,一级注册结构工程师,email:1105086952@qq.com。