- 摘 要
-
(1 上海同程建设科技工程有限公司, 上海 200092; 2 上海创盟国际建筑设计有限公司, 上海 200092)
[摘要]基于张拉结构的施工模拟分析的理论基础,对长春奥林匹克公园体育场轮辐式张拉结构的索系张拉步骤进行介绍,并通过有限元软件ANSYS模拟了施工过程中的背索安装、环索同步提升,谷索张拉三个阶段。张拉过程中拉索索力稳定无跳跃,结构位形最终达到成形目标态,钢结构von Mises应力均较小。
[关键词]长春奥林匹克公园体育场; 轮辐式张拉结构; 施工模拟; 有限元分析
中图分类号:TU93+1, TU745.2文献标识码:A文章编号:1002-848X(2020)09-0098-05
.
Construction simulation analysis on the spoke tension structure of Changchun Olympic Park Stadium
HUANG Tao1,2, ZHAO Danwei1, ZHANG Xiaoguang1
(1 Shanghai Tongcheng Building Technology & Engineering Co., Ltd., Shanghai 200092, China;2 Shanghai ArchiUnion Architecture Design Co., Ltd., Shanghai 200092, China)
Abstract:Based on the theoretical basis of construction simulation analysis of a tension structure, the steps of cable system tension for the spoke tension structure in Changchun Olympic Park Stadium were introduced. The finite element software ANSYS was used to simulate the three stages in the construction process including the back cable installation, synchronous lifting of ring cable and valley cable tension. During the tension process, the cable force was stable and no jump occurred. The configuration of the structure finally reached the forming target state, and the von Mises stress of the steel structure was small.
Keywords:Changchun Olympic Park Stadium; spoke tension structure; construction simulation; finite element analysis
作者简介:黄涛,硕士,工程师,Email:huangtao595@163.com。