您现在的位置:建筑结构>> 期 刊>> 2019年>> 第20期>>正文内容
清远市科技馆与青少年活动中心A单元结构设计
周颖彬,陈小锋
摘 要

(华南理工大学建筑设计研究院有限公司, 广州 510641)

[摘要]清远市科技馆与青少年活动中心A单元结构设计中,通过采用钢桁架和无粘结预应力楼板解决了建筑功能对大跨、大空间的要求。并根据施工仿真,分析了结构各阶段的受力情况,确保了该方案的全过程可行性。最后,对大跨度区域进行了舒适度分析,验证得知楼板竖向振动加速度峰值可满足规范要求。

[关键词]钢桁架; 无粘结预应力; 施工仿真; 舒适度

中图分类号:TU318文献标识码:A文章编号:1002-848X(2019)20-0075-05

 

Structural design of part A of Qingyuan Science and Technology Museum and Youth Activity Center

Zhou Yingbin, Chen Xiaofeng

(Architectural Design & Research Institute of SCUT Co., Ltd., Guangzhou 510641, China)

Abstract:In the structural design of part A of Qingyuan Science and Technology Museum and Youth Activity Center, steel truss and unbonded prestressed slab were applied to meet the architects′ requirements of large span and wide space. In addition, according to the construction simulation, the stress of the structure of each stage was analyzed, which ensured the feasibility of the whole process of the scheme. Finally, the comfort degree of the large-span area was analyzed, and it was verified that the peak value of vertical vibration acceleration of the floor could meet the requirements of the code.

Keywords:steel truss; unbonded prestress; construction simulation; comfort degree

 

作者简介:周颖彬,硕士,一级注册结构工程师,Email: zhouyingbin_2012@163.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!