- 摘 要
-
(1 河南工业大学土木建筑学院, 郑州 450001; 2 河南省人民医院基建科, 郑州 450003)
[摘要]某大型医院新建病房楼主楼采用框架-剪力墙结构体系,裙房采用框架结构,二者之间不设防震缝。由于新建病房楼结构存在扭转不规则、凹凸不规则、主楼偏心布置及立面收进等超限情况,与老病房楼之间还设置了高位架空连廊,新建病房楼属于超限复杂高层结构。首先介绍新建病房楼的工程特点、结构布置及超限情况,然后对整体结构进行了弹性分析、时程分析和Pushover分析,最后有针对性地提出了抗震措施。结果表明,新建病房楼结构达到了预期的抗震性能目标,结构设计满足规范要求。
[关键词]超限复杂高层结构; 架空连廊; 时程分析; Pushover分析; 抗震性能目标
中图分类号:TU246-1+81文献标识码:A文章编号:1002-848X(2016)18-0062-04
Seismic performance analysis and design of an out-of-code and complicated high-rise structure
Xian Qingjun1, Jia Chenghui2
(1 School of Civil Engineering and Architecture, Henan University of Technology, Zhengzhou 450001, China; 2 Infrastructure Division, People′s Hospital of Henan Province, Zhengzhou 450003, China)
Abstract:The main building of the newly-built ward building of a large-scale hospital adopts the frame-shearwall structural system and the podium adopts frame structure, and there is no seismic joint between them. The newly-built ward building belongs to the out-of-code and complicated high-rise structure because there are out-of-code conditions of torsion irregularity, concave-convex irregularity, eccentric arrangement of main building and vertical setback and there are also high spatial corridors connected with the old ward building. First, project characteristics, structural arrangements and out-of-code conditions of the newly-built ward building were introduced. Then elastic analysis, time-history analysis and Pushover analysis were conducted on the whole structure. Finally, specific seismic measures were proposed. The results show that the newly-built ward building can achieve the expected seismic performance objectives, and structural design meets the code requirements.
Keywords:out-of-code and complicated high-rise structure; spatial corridor; time-history analysis; Pushover analysis; seismic performance objective
*河南工业大学高层次人才基金项目(2014BS004)。
作者简介:咸庆军,博士,一级注册结构工程师,Email: xianqj@126.com。