您现在的位置:建筑结构>> 期 刊>> 2016年>> 增刊S1>>正文内容
装配整体式剪力墙结构预制率计算探讨
丁嘉卿,胡凯,陈云琪,瞿革,李庆武,肖炳辉
摘 要

(中船第九设计研究院工程有限公司, 上海 200063)

[摘要]结合装配式建筑的特点及各地政策、规范和推进发展意见,就剪力墙体系下的预制率计算及构件选取进行探讨。依据各地政策、法规及惯常做法,探讨了预制构件在项目中的拆分及选择,并根据各地的预制率的计算规则,比较各构件预制率占比及各设计阶段的表达方式。同时,以某设计项目为例,再次探讨了预制率在装配整体式剪力墙结构中的考虑及应用。

[关键词]预制装配率; 预制混凝土构件; 预制外挂墙板; 装配整体式; 剪力墙结构

中图分类号: TU318 文献标识码: A文章编号:  1002-848X(2016)S1-0628-05

 

Disscussion on the precast rate of monolithic precast concrete shear wall structure

Ding Jiaqing, Hu Kai,  Chen Yunqi, Qu Ge, Li Qingwu, Xiao Binghui

(China Shipbuilding NDRI Engineering Co., Ltd., Shanghai 200063, China)

Abstract: Based on the characteristics of the Shanghai assembly building, the standard of the local standard and the development of the system, the calculation of the precast rate of the whole shear wall system was discussed. According to the policies, regulations and practices of different provinces, split methods and selection principles of precast components were discussed, and the weight ratio and the expression of the prefabricated rate in several design stages were compared according to the calculation rules in different areas. In addition, the consideration and the application of the prefabricated rate in monolithic precast concrete shear wall structures were discussed based on a design project.

Keywords: precast rate; precast concrete component; precast concrete facade panel; monolithic precast concrete shear wall structure

 

作者简介: 丁嘉卿,学士,工程师,主要从事建筑设计及BIM技术应用研究工作等,Email:dingjq88@hotmail.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!