(上海结建民防建筑设计有限公司, 上海 200235)

[摘要]对山东省青岛市某高层建筑结构设计时上部结构嵌固部位设置的选择进行了研究。对上部结构嵌固部位分别设置在管道夹层的顶板、管道夹层楼板、基础底板三种情况进行计算分析,得出三种选择对工程结构影响的利与弊。研究结果显示,上部结构的嵌固部位首选应设置在主楼±0.000夹层顶板,这种做法不仅满足规范要求,而且从结构受力角度也是最合理的;其次,可考虑把上部结构的嵌固部位设置在基础底板,这种做法同样也是满足规范的要求,但是从结构受力角度来说较不合理,会导致结构造价的增加;最后一种选择是将上部结构的嵌固部位设置在夹层楼板,这种做法从结构设计受力角度也是较为合理的选择,但是无梁楼盖的结构形式不满足规范条文的要求,不提倡这种做法。因此,在实际工程中,上部结构嵌固部位的确定过程往往较为复杂,结构设计人员需要采用包络设计方法,对不同部位的结构模型进行比较计算,取不利值设计,以确保结构的安全。

[关键词]上部结构嵌固部位; 地上结构相关范围; 层间侧向刚度比; 无梁楼盖结构; 现浇梁板结构

中图分类号: TU318 文献标识码: A文章编号:  1002-848X(2016)S2-0158-03

 

On upper embedded parts of the structure of solid set of discussion

Chen Linxin, Gong Wenhui

(Shanghai Junction Built Civil Defense Architecture Design Co., Ltd., Shanghai 200235, China)

Abstract: A high-rise building structure design in Qingdao city in shandong province when the upper structure built-in parts set selection was studied. Three kinds of circumstances inclued Installed in the pipeline for upper structure built-in parts of interlining, pipe mezzanine floor, roof foundation slab calculation were respectively studied. It is concluded that the impact of three options on engineering structure, advantages and disadvantages. Research results show that the built in parts of the upper structure choice should be set in the main building roof ±0.000 interlining, it not only meet the specification requirements, and from the Angle of structure is reasonable; Second, consider the upper structure of build-in parts installed in the foundation slab, this kind of practice is also meet the requirements of specification, but from the Angle of structure is unreasonable, will lead to increased cost structure; The last option is to set the build-in parts of the upper structure on the mezzanine floor, this kind of practice from the point of view of mechanical structure design is reasonable choice, but there is no provision of the slab-column system structure does not meet the specification requirements, discourage this practice. Therefore, in practical engineering, the upper structure built-in parts is often more complex, the process of structure design personnel need to use the envelope design method, carries on the comparison to different parts of the structure model calculation, the negative value design, in order to ensure the safety of the structure.

Keywords: upper structure built-in parts; ground structure related scope; lateral stiffness ratio between the layers; no slab-column system structure; cast-in-place beam slab structure

 