- 摘 要
-
(中国航空工业规划设计研究院,北京 100011)
[摘要]阐述了湖州垃圾焚烧发电工程主厂房的结构方案选择、计算软件应用、垃圾储存池设计、混凝土结构超长无缝施工技术、地基基础设计等问题,论述了垃圾焚烧发电厂主厂房结构的特点及设计要点。
[关键词]垃圾焚烧发电厂;垃圾储存池;超长无缝施工技术;SATWE
Structural design of Huzhou power project by incinerating refuse
Gao Zongrui, Tang Xiaojun, Zhu Dan(China Aeronautical Project & Design Institute, Beijing 100011, China)
Abstract:Design of Huzhou power project by incinerating refuse, such as the selection of structural scheme for the main plant, use of the structure calculation software, design of refuse bunker, non-joint construction technique as to the over-length concrete structure, subsoil treatment and foundation design, is introduced and expounded. The features and essentials of structural design in the main plant are discussed by illustrating its specific engineer design.
Keywords:power plant by incinerating refuse; refuse bunker; over-length and non-joint construction technique; SATWE
作者简介:高宗瑞,高级工程师,Email:13011088598@m165.com。
参考文献
[1]GB50010—2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.
[2]GB50011—2001建筑抗震设计规范[S].北京:中国建筑工业出版社,2001.
[3]GB50017—2003钢结构设计规范[S].北京:中国计划出版社,2003.
[4]曾华荣.破碎带地基基础分析处理[J].西部探矿工程,1997,9(6).
[5]王铁梦.工程结构裂缝控制[M].北京:中国建筑工业出版社,1997.