- 摘 要
-
(中国建筑科学研究院,北京 100013)
[摘要]成都凯德风尚项目总建筑面积为609 301m2,位于7度区。对2栋2层的框架结构别墅和26栋19~20层的高层剪力墙住宅结构进行了隔震设计,隔震层设置在地下室顶板以上,采用了近4 000个隔震支座,是目前国内设计的最大的隔震小区,也是层数最多的高层剪力墙结构隔震项目。设计中验算了7度罕遇地震作用下结构的安全和8度罕遇地震下的结构抗倾覆问题,并设置了抗拔装置和抗风装置。计算分析表明,采用隔震措施可显著降低上部结构的地震作用,提供对建筑结构、房屋设施和人员的全面保护。
[关键词]高层建筑结构;隔震;时程分析
Research on design of base-isolated high-rise structure of Capital Land the Loft Chengdu
Xiao Congzhen, Xue Yantao, Zeng Demin, Li Yongshuang (China Academy of Building Research, Beijing 100013, China)
Abstract:The general floorage of Capital Land the Loft Chengdu is 609 301m2. The project is located in region of seismic fortification intensity Ⅶ. The two buildings with frame structures of 2 stories and twenty six building with shear wall structures of 19~20 stories are designed to be base-isolated, and about 4 000 isolators are adopted. The isolators are located between the basement and first floor. The project will be the largest base-isolated project, and also will be the highest isolated shear wall structure in China. The structures are designed to stand rear earthquake for seismic fortification intensity Ⅶ, and the overall overturning can be prevented under the rear earthquake for seismic fortification intensity Ⅷ. Devices to stand the overturning and wind load are adopted. It can be found that the earthquake reaction of the structure can be greatly reduced after using of base-isolation. The design of base-isolation can provide better protection to structure, facilities and people in the building.
Keywords:RC structure; high-rise building; base-isolated structure; time history analysis
作者简介:肖从真,博士,研究员,一级注册结构工程师,研究方向钢混组合结构、工程抗震和高层建筑结构,Email:xiaocongzhen@cabrtech.com。
参考文献
[1]GB50009—2001 建筑结构荷载规范(2006年版)[S].北京:中国建筑工业出版社,2002.
[2]GB50011—2001 建筑抗震设计规范[S]. 北京:中国建筑工业出版社,2001.
[3]GB20688 3—2006 橡胶支座-第3部分:建筑隔震橡胶支座[S]. 北京:中国建筑工业出版社,2006.
[4]CECS126:2001 叠层橡胶支座隔震技术规程[S].北京:中国工程建设标准化协会,2001.
[5]崔京浩,党育,杜永峰,等.基础隔震结构设计及施工指南[M].北京:水利水电知识产权出版社,2007.