软土地区地铁车站深基坑开挖中框架逆作法的设计与应用
罗发扬,贾坚
摘 要
(同济大学建筑设计研究院,上海 200092)
[摘要]综合明挖顺作法开挖速度快、楼板逆作法刚度大的优点,运用明挖与逆作相结合的框架逆作法,在深基坑关键部位以楼板的框架体系代替支撑,在留出大量出土空间的同时,支撑体系的整体刚度得以加强,从而充分利用“时空效应”原理,加快土体开挖和支撑安装速度,达到控制基坑变形、保护基坑周边环境的目的。
[关键词]深基坑;框架逆作法;变形控制
Application of Frame-top-down Construction in Deep Excavation of Subway Station in Soft Clay
Luo Fayang,Jia Jian(Architectural Design & Research of Tongji University,Shanghai 200092,China)
Abstract:The frame-top-down construction method is put forward,which combines the quickconstruction feature of open excavation and the rigid-stiffness feature of top down excavation. The brace is replaced by the frame at the pivotal place of the deep pit,the large area for excavation is remained, and the stiffness of the brace system is improved. So,the time-space effect method is applied to accelerate the excavation and brace making and control the pit deformation and protect the environment.
Keywords:deep pit; frame-top-down construction method; deflection control
作者简介:罗发扬(196-),男,学士。E-mail:luofy01@126.com
参考文献
[1]刘建航,侯学渊. 基坑工程手册[M]. 北京:中国建筑工业出版社,1997.
[2]上海市工程建设规范-地基基础设计规范DGJ08—11—1999[S]. 上海:上海市工程建设标准化办公室,1999:182.
[3]贾坚,罗发扬. 高架基础旁深基坑开挖的变形控制方法[J].岩土工程学报,2006,28(S1).
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!