您现在的位置:建筑结构>> 期 刊>> 2008年>> 第04期>>正文内容
PHC管桩在高速公路桥梁工程施工中引起的超孔隙水压力分析
张鹤年 刘松玉 季鹏
摘 要
(东南大学交通学院,南京 210096)
[摘要]根据某高速公路桥梁工程PHC管桩施工过程中的实测结果,利用各测点产生的超孔压消散曲线,结合孔压计埋设图,分析了超孔隙水压力的大小、分布、变化规律及影响范围,得出以下结论:1)随着入土深度的增大,孔隙水压力均有开始减小然后增大的过程;2)测点距离沉桩越近,孔隙水压力影响越大,且孔隙水压力数值变化越明显;3)位于深层的超孔隙水压力随着有效半径的减小明显增大。提出了减弱超孔隙水压力的措施。
[关键词]PHC桩;高速公路桥梁工程;超孔隙水压力;措施
Analysis on excess pore water pressure caused by installing PHC in expressway bridge
 Zhang Henian,Liu Songyu,Ji Peng
 (Transportation College of SEU, Nanjing 210096, China)
Abstract:According to the results measured during construction of PHC pile in an expressway bridge engineering, the magnitude, distribution, the changing regularity and effect range of the excess pore water pressure are discussed. Some conclusions are got: with the depth increasing, pore water pressure reduces at first, and then increases;with the effective radius getting smaller, pore water pressure affects greater, and the change of the pore water pressure is more obvious;the pore water pressure in deeper layer increases more obviously with the reduction of the effective radius. Some measures are put forward in order to eliminate the effect of pore water pressure.
Keywords:PHC pile; expressway bridge engineering; excess pore water pressure; measure
*江苏省交通科学研究计划项目(05Y44)。

作者简介:张鹤年(1980-),男,博士研究生,E-mail:zhanghn_001@163.com。

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!