[摘要] 现浇混凝土密肋梁楼盖形式较为广泛,目前较多采用的周转模板一旦成型无法变更尺寸,存在较多弊端。该技术基于一种拼装式定型塑料组合式模壳,利用其自身各组装件的拼装相互连接起来,满足设计要求的各种模板尺寸。以达到提高质量,保证安全、经济合理、缩短工期的良好效果。
中图分类号:TU375 文献标识码:A 文章编号:1002-848X()
作者简介:王明明,学士,工程师,一级注册建造师,从建筑工程检测鉴定与加固,Email:wangmingming2006@126.com。
Cast-in-situ concrete ribbed beam floor truss with finalize the design plastic composite template technology
Wang Mingming1,2
(1 Shandong Provincial Academy of Building Research, Jinan 250031,China;
2 College of Civil Engineering ,Jinan University ,Jinan 250022,China;)
Abstract: Cast-in-situ concrete ribbed slab floor form become more widely.The turnover in use more template once molding can't change size, Many disadvantages exist. The technology is based on a kind of assembled type shape plastic composite mould shell, using its own all the assembly parts assembled to connect each other, meet the design requirements of various template size. To improve the quality, ensure the safety, economic and reasonable good effect, shorten the construction period.
Keywords: ribbed beams; template; plastic mould; monolithic template
参 考 文 献
[1] 寇民道,刘永涛,白天. 密肋楼板模壳施工工艺探讨[J].河南建材, 2009(3):149-150.
[2] 霍俊刚,付鹏. 密肋板早拆体系模壳施工技术浅析[J].科技创新导报,2011(20):41.
[3] 戚卫东, 周卫国, 侯小龙. 塑料模壳支模体系的应用实例[J].浙江建筑,2007,24(9):35-37.
[4] 徐启章, 张先利, 孙明英. 密肋梁空心楼盖(一次性模壳)施工技术[J]. 建筑工人,2013(6):30-31.
[5] 杨清岭, 岳峰. 高支模与塑料模壳支设密肋楼板结合施工技术[J]. 安徽建筑,2012(3):86-87.
[6] 邓磊. 密肋楼盖在“协和干细胞工程”建设中的应用[J]. 中国科技信息,2006(8):94-95.
[7] 王慧磊. 无机玻璃钢模壳免拆施工技术[J]. 山西建筑,2010,36(21):148-149,157.
[8] 何涛. 钢筋混凝土密肋楼盖设计与施工[J]. 西北建筑与建材,2003(92):18-19.
[9] 崔丰广. 青岛鲁商中心工程项目建设管理研究[D]. 青岛:青岛理工大学, 2013.
[10] 王杰, 李栋森. 现浇混凝土蜂巢空腹楼盖技术的应用[J]. 建筑技术, 2007,38(2):118-120.