南京招商局旧址办公楼修缮设计的技术风险控制*
- 摘 要
-
(东南大学建筑设计研究院,南京210096)[摘要] 既有建筑修缮加固设计的不确定因素常常会超过新建建筑,若检测鉴定数据样本量不足或过于离散,设计资料不全,材料劣化速度不确定等,则存在较多偏离设计预期的风险,以南京招商局旧址办公楼修缮设计为例,探讨了历史建筑修缮改造实践中提高结构安全储备进行风险控制的具体措施。[关键词] 风险规划; 历史建筑; 修缮设计中图分类号:TU375 文献标识码:A 文章编号:1002-848X(2013)S2-0690-03Technical Risk Control of Renovation Design for Nanjing Zhaoshang BuildingFang Lixin, Xia Shiyang, Sun Xun( Architectural Design & Research Institute Of Southeast University, Nanjing 210096, China)Abstract: Uncertainty factors existing in the Renovation Design of historical buildings are often greater than new buildings, limited data and discrete information from available samples includes structures characteristics and material degradation usually result in risk of deviation from the original design proposal. We take the renovation of Nanjing Zhaoshang Building as example, discusse the renovation practice for improving structure safety margin in historic buildings reservations.Keywords: risk Plan; historical buildings; renovation design