超前地质预报技术在大梁山隧道施工中的应用
- 摘 要
-
(1 国家知识产权局专利局专利审查协作北京中心材料工程发明审查部,北京 100083;2 中交路桥技术有限公司试验检测中心,北京 100011)[摘要] 介绍了超前地质预报技术在大梁山隧道施工中的应用,针对大梁山隧道复杂的地质条件,研究了超前地质预报测点的布置方法和理念,针对不同的岩层条件,确定了相应的监控方法。实践证明,综合超前地质预报可获得更加多样化的探测信息,对隧道地质灾害有较好的预报效果,保证隧道快速、安全的施工。[关键词] 超前地质预报;TGP206;隧道中图分类号: TU94+.3,[U25] 文献标识码:A 文章编号:1002-848X(2013)S2-0145-04The application of comprehensive advanced geological prediction in Daliangshan tunnel constructionWang Li1, Sunli2, WangJunfeng1, ZhangXianbing1(1 Patent Examination Cooperation Center of the Patent Office, SIPO, Beijing, 100083; 2 CCCC Road and Bridge Consultants Co., Ltd., Beijing, 100011)Abstract: The application of comprehensive advanced geological prediction technology in Daliangshan tunnel construction was introduced, in light of complicated geological conditions of Daliangshan tunnel, studies the layout method and interpretation concept of advanced geolgy prediction sites, and determines corresponding monitoring method according to different rock conditons. The practice proved that the comprehensive advanced geological prediction could get more diverse detection information, had better prediction effect to tunnel geological disasters, so as to ensure fast and safe tunnel construction.Keywords: comprehensive; TGP206; tunnel