您现在的位置:建筑结构>> 期 刊>> 2014年>> 第17期>>正文内容
超深TRD工法控制承压水的邻近地铁深基坑工程设计与实践*
王卫东1,2,常林越1,2,谭轲1,2
摘 要

1 华东建筑设计研究总院地基基础与地下工程设计研究中心,上海 2000022 上海基坑工程环境安全控制工程技术研究中心,上海 200002

[摘要]基于邻近运营地铁隧道的苏州财富广场深基坑工程,从基坑支护结构设计、深层承压水处理等方面采取了一系列针对性措施来保护地铁隧道。首次在苏州地区采用超深TRD工法等厚度水泥土搅拌墙,有效地隔断了深层承压含水层,避免了承压水降水对地铁隧道的影响,相比采用地下连续墙隔断方案,大大节省了工程投资。建立三维有限元模型对基坑开挖过程进行了模拟分析,结果表明:基坑围护体和地铁隧道位移计算值和实测值较吻合,地铁隧道位移的分布和发展与基坑围护体的位移及开挖进程密切相关,地铁隧道水平和竖向位移主要产生在邻近基坑开挖的范围内,隧道底部埋深与基坑挖深较接近时隧道产生隆起。该基坑工程成功实施,基坑开挖和降水满足保护地铁隧道的要求。

[关键词]基坑; 地铁隧道; 超深TRD工法; 等厚度水泥土搅拌墙; 地下连续墙; 承压水; 有限元

中图分类号:TU46+3      文献标识码:A      文章编号:1002-848X(2014)17-0056-07

Design and practice of a deep foundation pit project adjacent to subway tunnel using super deep TRD construction method to control confined water

Wang Weidong1, 2, Chang Linyue1, 2, Tan Ke1, 2

1 Department of Underground Structure & Geotechnical Engineering, East China Architecture

Design & Research Institute, Shanghai 200002, China; 2 Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations, Shanghai 200002, China

Abstract:The deep foundation pit project of Suzhou Fortune Plaza is adjacent to subway tunnels in operation. A series of technical measures were taken to protect the subway tunnels such as the structural design of the supporting system and the treatment method of the deep confined water. The super deep TRD construction method of cement-soil wall with uniform thickness was firstly used in Suzhou area to cut off the deep confined water layer effectively. As a result, the influence of pumping the confined water on the subway tunnels was effectively avoided. Comparing to using the underground diaphram wall to cut off the deep confined water, the project investment  was significantly reduced by using super deep TRD construction method of cement-soil wall with uniform thickness.Three-dimensional finite element model was established to simulate the foundation pit excavation process. The results show that the calculated displacement values of the retaining wall and the subway tunnels are in good agreement with the measured values. The distribution and development of the displacement of the subway tunnels are closely related to the displacement of the retaining wall and the excavation process of the foundation pit. The horizontal and vertical displacement of the subway tunnels mainly occur in the range of the neighboring excavation. The tunnels are uplifted when the bottom of the tunnels was close to the bottom of the foundation pit. The foundation pit is successfully excavated. The effects of foundation pit excavation and dewatering on the subway tunnels satisfy the requirements of protecting the subway tunnels.

Keywords:foundation pit; subway tunnel; super deep TRD construction method; cement-soil wall with uniform thickness; underground diaphram wall; confined water; finite element

*上海市科委平台建设项目(13DZ2251400),上海市建交委科研项目(建管2013-009-009),国家十二五科技支撑计划(2012BAJ01B02)。

作者简介:王卫东,博士,教授级高级工程师,总工程师,Email:weidong_wang@ecadi.com

参考文献

1]应名洪. 城市轨道交通网络化建设与运营[M. 北京:中国铁道出版社, 2007.

2]戴斌, 王卫东. 受承压水影响深基坑工程的若干技术措施探讨[J. 岩土工程学报, 2006, 28(S1): 1659-1663.

3]邢皓枫, 张振, 吴洁妹, . 复杂地层中地铁换乘双层承压水处理技术研究[J. 岩土工程学报, 2011, 33(10): 1609-1614.

4]王卫东, 朱合华, 李耀良. 城市岩土工程与新技术[J. 地下空间与工程学报, 2009, 7(S1): 1274-1291.

5]王卫东, 邸国恩, 王向军. 超深TRD工法构建的等厚度型钢水泥土搅拌墙支护工程实践[J. 建筑结构, 2012, 42(5): 168-171.

6]王卫东, 邸国恩. 超深TRD工法等厚度水泥土搅拌墙技术与工程实践[J. 岩土工程学报, 2012, 34(S1): 628-634.

7]王卫东, 沈健, 翁其平, . 基坑工程对邻近地铁隧道影响的分析与对策[J. 岩土工程学报, 2006, 28(S1): 1341-1345.

8]俞缙, 许琼鹤, 邢崴崴, . 基坑工程下地铁隧道隆起位移数值模拟分析[J. 岩土力学, 2007, 28(S1): 653-657.

9]郑刚, 刘庆晨, 邓旭. 基坑开挖对下卧运营地铁隧道影响的数值分析与变形控制研究[J. 岩土力学, 2013, 34(5): 1459-1468.

10]李伟强, 孙宏伟. 邻近深基坑开挖对既有地铁的影响计算分析[J. 岩土工程学报, 2012, 34(S1): 419-422.

11]刘国彬, 王卫东. 基坑工程手册[M. 北京:中国建筑工业出版社, 2009.